Home / Tools / Inverse-time curves
IEC and IEEE inverse-time curves
Calculate the operating time of a 51 element with the standard curves, see it on a log-log plot and compare it with the backup relay to check the coordination margin over the whole current range.
IEC 60255-151dependent-time characteristicIEEE C37.112inverse curves and reset
Results
— s
— s
— s
—
—
— s
Want an engineer to review this case? Our team reviews your data and results and quotes the study or the settings work you need.
Charts
- Relay A
- Relay B
- Maximum fault and margin
- Margin B − A
- Required margin and maximum fault
Calculation and details
Step-by-step calculation
What it means for coordination
What it is for
The 51 overcurrent element operates with a time that drops as current rises. For the relay closest to the fault to clear first, the backup curve has to stay above it with enough margin over the whole current range both relays see. Use this tool to check existing settings, prepare the points of a secondary injection test or verify by hand a result from coordination software.
How it is calculated
IEC 60255-151dependent-time characteristic
t = TMS · (k / ((I / Is)α − 1) + c)For IEC curves, c = 0. I is the measured current, Is the pickup setting and TMS the time multiplier setting.
IEEE C37.112inverse curves and reset
t = TD · (A / (Mp − 1) + B) · tr = TD · tr / (1 − M²) for M < 1M = I / Is and TD is the time dial. The second equation is the reset, which emulates the return of the electromechanical disk and matters for intermittent faults: with M = 0 it equals TD · tr. IEC curves have no standard reset; each relay makes it instantaneous or definite-time.
| Curve | Standard | Constants |
|---|---|---|
| IEC standard inverse (SI) | IEC 60255-151 | k = 0.14; α = 0.02 |
| IEC very inverse (VI) | IEC 60255-151 | k = 13.5; α = 1 |
| IEC extremely inverse (EI) | IEC 60255-151 | k = 80; α = 2 |
| IEC long-time inverse (LTI) | IEC 60255-151 | k = 120; α = 1 |
| IEEE moderately inverse (MI) | IEEE C37.112 | A = 0.0515; B = 0.114; p = 0.02; tr = 4.85 |
| IEEE very inverse (VI) | IEEE C37.112 | A = 19.61; B = 0.491; p = 2; tr = 21.6 |
| IEEE extremely inverse (EI) | IEEE C37.112 | A = 28.2; B = 0.1217; p = 2; tr = 29.1 |
Coordination margin
Δt(I) = tB(I) − tA(I) ≥ required marginIt is checked at the maximum fault both relays see and also over the whole range from pickup, because two curves of different shape can come close at low currents. The indicator is green if Δt meets the margin, yellow if the backup operates later but without the margin, and red if it operates first.
Limits of the calculation
- IEC 60255-151 sets the accuracy of the characteristic between 2 and 20 times pickup. Outside that range the tool warns: above 20 times many relays limit the curve, and near 1 times the actual pickup (around 1.05 to 1.1 times Is) makes the time undefined or very long.
- It assumes constant current during the fault, no minimum time, no instantaneous element and no CT saturation.
- Some manufacturers scale the dial differently or add a fixed time to the curve: always confirm with the relay manual before setting.
- The required margin is set by the coordination study according to the breaker, the relay type and the measurement errors; the preloaded value is only an example.
Frequently asked questions
How is the operating time of an IEC standard inverse curve calculated?
With the IEC 60255-151 equation (IEEE C37.112 uses its own form): t = TMS · 0.14 / ((I/Is)^0.02 − 1). For example, with a current of 10 times pickup and TMS = 0.1, the relay operates in 0.1 · 0.14 / (10^0.02 − 1) = 0.297 s. The other IEC curves change only the constants k and α.
What coordination time interval is used between two overcurrent relays?
The interval between the backup relay and the one closest to the fault must cover the breaker interrupting time, relay overtravel and the CT and relay errors. Common references use 0.2 to 0.4 s depending on the technology; the value for each case is set by the protection coordination study, checked over the whole current range both relays see.
What is the difference between IEC and IEEE curves?
Both are inverse-time characteristics, but with different equations: IEEE C37.112 adds a constant B and defines a reset that emulates the electromechanical disk, t = TD · tr / (1 − M²). Also, the IEC TMS and the IEEE TD are not on the same scale, so the same dial number does not give the same time.
We do your protection coordination study
We model the system, calculate the short circuit and set the curves of every relay so the one closest to the fault clears first. Then we load the settings into the relays, remotely as well.