Tiza Group

Home / Tools / Function 26 oil temperature

Function 26: oil temperature

Transformer oil temperature from an RTD sensor: alarm and trip stages, reset, times and test plan.

Siemens SIPROTEC 5 7UT§ 11.41temperature supervisionIEEE C37.91§ 2000, 8.2.1oil temperatureIEEE C37.2§ 2008function numbers

Example cases
Function 26: oil temperature

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings
°C

Example value: use the one given by the transformer manufacturer.

s
°C

Example value: use the one given by the transformer manufacturer.

s
E3Simulation
°C

Without a valid value the temperature point cannot pick up.

E5Relay tolerances
%
°C
°C
%
ms
E4Installation and test set
ms

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Reset

—

Test plan

—

From the primary to the relay and the trip coil
  • Rating
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

The 26 watches the top oil temperature of the transformer. An RTD sensor in the thermowell on the cover delivers the temperature to a temperature box (RTD box), which sends it to the relay through a communication port.

The first stage gives the alarm and the second trips. The temperatures are set by the transformer manufacturer according to its loss-of-life policy.

How it operates

  • Each stage picks up when the temperature reaches its setting and operates after its delay. It resets when the temperature falls below the setting by the reset difference.
  • The stage trip indications do not enter the relay's trip logic on their own: they must be assigned to the output that opens the breaker.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The temperature is simulated at the sensor input with an RTD simulator or a resistance decade box. The plan finds the pickup and reset of each stage with slow ramps and measures the time 5 °C higher.

At the end, disconnect the sensor and check that the relay signals the measurement fault.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • The temperature is typed in by hand: the tool does not calculate the oil heating with the load.
  • The example temperatures are ours: use those of the transformer manufacturer.
  • The response time of the sensor and of the communication with the temperature box is not modeled.

Frequently asked questions

Does the 26 protect the winding?

Not entirely: after a sudden load increase the top oil takes time to heat up and the winding hot spot runs ahead. That is what the winding thermal image is for.

When does the trip stage reset?

When the temperature falls below the setting by the reset difference: with 105 °C and 3 °C, it resets at 102 °C.

How is the temperature simulated in the test?

By disconnecting the sensor and putting in its place an RTD simulator or a resistance decade box set to the sensor value at that temperature.

Related guides

Other tools

All tools
WhatsApp