Busbar mechanical stresses

Enter the tube, span, climate and short-circuit current: the tool calculates the tube stress and deflection, the post insulator load, the aeolian vibration risk, the expansion, and the sag and tension of a strung conductor.

IEC 60909-0§ 8.1peak currentCIGREwind, ice and vibration

Example cases
Busbar mechanical stresses

Only the basic data; the rest is taken with typical values.

ALearn

E1Tube and span
mm
mm
m
kg/m

0 if none.

GPa
kg/m³
MPa

From the tube datasheet.

µm/(m·K)
E2Climate
km/h

From the site, for example with NSR-10, title B.

mm
K
km/h

For aeolian vibration.

E3Short circuit
kA
m
E4Post insulator
N

At the insulator head, per its datasheet.

m
m

Your design criterion's.

E5Strung conductor
m
kg/m
mm
N
MN
µm/(m·K)
K

From the installation value. Negative: cold.

Use a decimal point. The calculation runs in your browser and updates as you type.

Tube stress with wind

— MPa

Wind load

— N/m

Short-circuit stress

— MPa

Insulator use

— %

Aeolian vibration

—

Conductor sag

— m

The span: tube, post insulators and loads
  • Deflected tube (exaggerated)
  • Loads
Side view of the span: the arrows are the loads per metre and the curve is the tube deflection, exaggerated so it shows. The insulators change colour with their use.
Tube stress in each load case
  • Stress
  • Yield strength
Short-circuit stress is static (tube dynamic factor that you enter).
Force on the center phase during the fault
  • Instantaneous force
  • Static maximum
  • Wind
Ampère force with offset currents that decay with the R/X constant. The maximum is (√3/2)·μ0·ip²/(2π·a).
Tube natural frequency and vortex band
  • Vortices
  • Natural frequency
  • Twice the band
If the natural frequency falls within the band swept by the laminar wind, the tube may resonate.
Conductor sag at installation and under the design load
  • Set-up
  • Design condition
The design sag is measured along the resultant of weight and wind; its vertical component is shown here.

Step-by-step calculation

What it is for

It checks a rigid tube busbar and a strung conductor of the same bay: tube stress and deflection under weight, ice and wind, short-circuit force, post insulator load, aeolian vibration risk, expansion, and conductor sag and tension at the design condition.

How it is calculated

CIGRE§ Green Bookwind

Wind on the tube

Fw = ½·ρ·V²·Cx·G·D

IEC 60909-0§ 8.1eq. 55

Short-circuit force

F′ = (√3/2)·μ0·ip² / (2π·a) · ip = κ·√2·I″k · κ = 1.02 + 0.98·e−3R/X

Euler-Bernoullibeam

Bending and deflection

σ sc

CIGRE§ Green Bookaeolian vibration

Aeolian vibration

fa = 51.75·Vw/d · fc = (γ/ℓ²)·√(E·J/m)

Vw in km/h and d in mm. There is a risk when fc is below twice fa.

Limits of the calculation

  • Static short circuit: without the dynamic factors or the plasticity factor of IEC 60865-1, without conductor swing or pinch effect.
  • A single-span load that is uniform; it does not include point loads (disconnectors, connectors) or wind on the insulators.
  • Earthquake, installation loads and loading-standard combinations are not calculated.
  • Strung conductor with supports at the same level and parabolic approximation (sag less than 10 % of the span).

Frequently asked questions

Why is the short circuit an estimate?

The electromagnetic force comes from Ampère's law, but the response of the tube and insulators depends on the ratio between their natural frequency and the network frequency. IEC 60865-1 gives those dynamic factors; this tool does not use it and leaves them as your own data, with 1 by default (static response). The tube stress is usually on the safe side; the insulator load may fall below the real one.

When does a tube need damping?

When its first natural frequency falls within the band of vortex frequencies produced by the site's laminar wind. A long, flexible tube resonates with light winds; a short, stiff one stays out of the wind's reach.

Which insulator carries more?

The intermediate post of a continuous bus takes the load of half a span on each side, twice that of an end post. The center post of two continuous spans reaches 5/4 of the load of one span.