Transformer control simulator

Simulate power transformer control: on-load tap changer with motor drive, regulator 90, master–follower parallel, staged cooling fans and Buchholz.

IEC 61850-7-4 Ed. 2ATCC, YLTC and YPTRIEC 60076-1:1993+A1:1999Rated power by cooling methodIEC 60076-7:2005Oil and hot-spot temperatures with the loadIEEE C37.2Device numbers 26, 49, 63, 71, 86 and 90

Example cases
Transformer control simulator

Only the basic data; the rest is taken with typical values.

ALearn

MLive controls
E1Test, network and load
%

Source-side voltage referred to rated: with the neutral tap and no load, the bus would sit at this value.

pu
E2Regulator 90 and parallel
%
%
s
%
pu
s
%
%
E3Tap changer and motor drive

The motor keeps running without finishing the step: the running-through protection operates.

s
s
%
s
E4Cooling and temperatures
°C
°C
K
°C
°C
°C
°C
°C
K
K
pu
pu
s
s
E5Own protections

Without this supply no contact of the own protections reaches the 86.

Use a decimal point. The calculation runs in your browser and updates as you type.

Tap

—

Bus voltage

—

Last command

—

Temperatures and alarms

—

Motor drive: raise and lower
  • Rating
  • Control wiring
  • Live
Contacts are drawn in their current state: closed is a straight line. The live wire from the positive rail lights up in yellow; a lit coil is energized. Click the selector or the pushbuttons in the drawing to operate them.
Motor and cooling
  • Rating
  • Control wiring
  • Live
Contacts are drawn in their current state: closed is a straight line. The live wire from the positive rail lights up in yellow; a lit coil is energized. Click the selector or the pushbuttons in the drawing to operate them.
Own protections
  • Rating
  • Control wiring
  • Live
Contacts are drawn in their current state: closed is a straight line. The live wire from the positive rail lights up in yellow; a lit coil is energized. Click the selector or the pushbuttons in the drawing to operate them.
The same logic with gates
A series contact is an input of an “&” gate; two parallel branches, a “≥1” gate; a normally closed contact, a negated input. They are drawn with the same equations the simulator runs.

Event log server

t (s)Signal or commandStatus

Functional tests of the control circuit

#TestAcceptance criterion
1Motor drive: raise and lower from the drive and from the SCADA, with the selector in each positionOne step per command, correct direction and the command only from whoever has the authority.
2Electrical limit switches at the highest and lowest tapsThe contactor of the blocked direction does not energize and the signal reaches the regulator.
3Running-through protectionIf the step does not finish, the drive stops and alarms.
4Regulator 90 with secondary injection: band, linear and inverse delay and blocksIt commands only outside the band, after the set delay, and does not command with the blocks active.
5Master–follower parallel: following, tap discrepancy and coupler openingThe follower copies the tap; the discrepancy blocks and alarms; with the coupler open the follower stops copying.
6Cooling: each temperature contact up to its contactor, and the manual selectorEach stage starts at its setting and stops with the hysteresis.
7Buchholz, pressure relief valve, flow relay, 26, 49 and level with their test deviceEach contact gives the alarm or the trip to the 86 defined by the protection philosophy.

Replay them in the simulator with the “Test” field and with the live controls.

What it is for

The control of a power transformer brings several things together: the tap changer with its motor drive, the voltage regulator that commands it, the cooling that starts on temperature and the own protections that take it out of service.

This simulator draws them with the transformer, its motor drive and its regulator, and lets them run live: lower the network voltage, change the band, put two transformers in parallel, trip a fan or the Buchholz, and see which contact opens and which command goes out.

How it operates

  • The regulator 90 compares the bus voltage with the set point. Inside the band it does nothing; outside it waits for the delay and commands one step. If the voltage returns to the band earlier, the delay restarts. With inverse delay, more deviation means less waiting.
  • Each command moves a single tap: the step-in-progress contact holds the contactor until the step ends, and a held command does not give a second step. The limit switches open the contactor of the blocked direction at the highest and lowest taps.
  • If the step does not finish, the running-through relay trips the drive motor protective switch. The regulator does not raise with the voltage below its undervoltage limit, does not operate on overcurrent and stays blocked if the 86 tripped.
  • In master–follower, the follower copies the master tap after each step. If the taps stay different for longer than the discrepancy timer, the regulator blocks automatic control and alarms. With the coupler open the follower stops copying the master; with the coupler closed and no parallel logic the regulator blocks automatic control and alarms.
  • The winding indicator contacts start the fan groups as the temperature rises and stop them with a hysteresis as it falls. Buchholz surge, pressure relief valve, tap changer flow relay and the 26 and 49 trips go to the lockout relay 86; the Buchholz gas and low level only alarm.

Limits of the calculation

  • It is a principle circuit, not a manufacturer's drawing. Your motor drive, regulator and panel may have other contacts and other interlocks: compare with your drawings.
  • All times, thresholds and taps are example settings. Use those of the manufacturer and the study.
  • The thermal model is first order, with simplified exponents and time constants compressed to seconds. It cannot be used to calculate the permissible load.
  • The parallel scheme is master–follower with two identical transformers. The circulating current and power factor methods are not simulated.
  • A step already started always finishes, even if F1 opens or the motor protective switch trips; in a real drive it may stop between positions. Step-by-step operation comes from contact S13, which holds the contactor only during the step, and from the new command each step requires.
  • The pressure relief valve and the tap changer flow relay trip to the 86 as usual practice; their destination is set by the protection philosophy. Some schemes also trip on very low oil level; here the level only alarms.

Frequently asked questions

Why must the band be larger than the step?

Because each step moves the voltage by a fixed amount. If the band is narrower, after the step the voltage ends outside on the other side and the regulator commands the opposite step: the tap changer hunts between two taps.

Does a held command move several taps?

No. The drive gives one step per command: the step-in-progress contact holds the contactor until the step ends, and the next one needs a new command.

What happens if the follower does not copy the tap?

A circulating current remains between the two transformers. When the discrepancy timer expires, the regulator blocks automatic control of the group and alarms.