Tiza Group

Home / Tools / Function 67/67N directional

Function 67/67N: directional overcurrent

Phase and ground directional overcurrent: rotated reference, forward zone, phasors, the relay inside and a boundary-angle test plan.

Siemens SIPROTEC 5§ 6.15phase directionalSiemens SIPROTEC 5§ 6.16earth directionalIEEE C37.2§ 2008function numbers

Example cases
Function 67/67N: directional overcurrent

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings
A
s
°

The phase A unit measures IA against UBC rotated by this angle; forward is ±88° around it.

E2Settings, part two
A
s
°
°
V
E3Simulation
A
°

What makes the current lag the voltage in a fault: the angle of the network impedance.

%
E4Installation and test set
V
A

Example value: enter that of your test set. Points that exceed it are marked.

V

Example value: enter that of your test set.

E5Relay tolerances
%
% of In
%
ms
%
%
ms
ms
°

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Direction

—

Test plan

—

From the primary to the relay and the trip coil
  • Rating
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

The 67 is an overcurrent function that trips only if the fault is on one side of the relay. To find out, it compares the current angle with that of a reference voltage. The 67N does the same with the residual current and the residual voltage.

It is used in rings, parallel lines and feeders with generation, where the fault current can come from both sides.

How it operates

  • Phases: the phase A unit compares IA with the voltage between B and C, which does not collapse in a phase A ground fault. That reference is rotated by an adjustable angle and the forward zone spans ±88° around it.
  • Earth: compares −3I0 with the rotated U0; enabled only if 3I0 and U0 pass their minimums.
  • In a close-in three-phase fault, with almost zero voltage, the phase unit uses the voltage memorized before the fault.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The plan injects healthy voltages and a current of twice the pickup, and finds the boundary angles at ±88° from the center of the zone by rotating the current. It checks that the function does not trip with the current reversed.

For the 67N, lower the phase A voltage to zero: U0 becomes one third of the phase voltage, at 180°. At the end, lower the residual voltage below the minimum and check that it does not operate.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • The fault is simulated with ideal phasors from a strong source; the source impedance is not modeled.
  • The ±88° phase zone is the one in the cited manual; other relays use other widths.
  • Directional comparison schemes are not calculated; the send and receive signals are drawn as inputs and outputs.

Frequently asked questions

Why is the reference voltage rotated?

To center the forward zone on the fault current. In an earth fault, the voltage between the healthy phases lags the voltage of the faulted phase by 90°, and the current lags that voltage by the network angle, 30° to 60° in most cases.

What is the memorized voltage?

The voltage the relay stored before the fault. In a very close three-phase fault the voltage drops almost to zero and is no use as a reference; the relay uses the memorized voltage for a short time.

How do you test the boundary angles?

With the current above pickup and the reference voltage fixed, the current angle is rotated in small steps until the function stops operating; the angle read is compared with the expected one and its tolerance.

Related guides

Other tools

All tools
WhatsApp