Function 27TN: neutral third harmonic
The stator next to the neutral: third-harmonic undervoltage, voltage and power supervision, the relay inside and a test-set test plan.
IEEE C37.102§ 4.3.3.1.1third harmonicSEL-700G§ p. 44tolerancesIEEE C37.2§ 2008function numbers
Results
—
—
—
—
Charts
- Rating
- Active signal
- Characteristic
- Tolerance band and point
How it was calculated and standards
Test plan with injection test set Pro
| # | Test | Injection | Expected | Minimum | Maximum | Measured | Result |
|---|
What each parameter is
| Parameter | Value | What it does |
|---|
Loading these settings into a relay? We configure it remotely.
What it is for
The 59GN does not see ground faults next to the generator neutral, because the neutral voltage there is almost zero. The 27TN covers that part with another signal: the third harmonic the machine itself generates.
In healthy service part of the third harmonic appears at the neutral. A ground fault near the neutral short-circuits it and that voltage falls: the 27TN trips on third-harmonic undervoltage.
How it operates
- The relay filters the third harmonic of the neutral voltage and compares it with the pickup. The closer the fault is to the neutral, the lower the voltage.
- Without excitation there is no third harmonic, so the function is supervised by the terminal voltage; many machines generate little third harmonic at low load and a power supervision is added.
- With the 59GN covering from the terminals and the 27TN from the neutral, together they reach 100 % of the winding if their zones overlap.
The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.
Test plan
The test set injects nominal voltages at the rated frequency on VA, VB and VC to meet the supervision and a third-harmonic voltage on VX. The plan searches the pickup by lowering VX and measures the time with half the pickup and with zero.
It also searches the supervision voltage by raising the terminal voltage with VX at zero and checks that the function stays blocked at low voltage.
Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.
Limits of the calculation
- The spread of the third harmonic along the winding is a straight-line estimate; the real coverage comes from measuring your machine.
- The third harmonic changes with load and reactive power: the tool takes the value you enter for the simulated point.
- Your test set must generate 3 times the rated frequency on one output and the rated frequency on the others at the same time.
Frequently asked questions
Where does the third harmonic come from?
From the shape of the field in the air gap: the generator does not produce a perfectly sinusoidal voltage. The third harmonic is the same in the three phases, so it does not show between phases but it does between the neutral and ground.
How is the 27TN set?
By measuring the neutral third harmonic over the whole range of load and reactive power, and setting the pickup below the lowest measured value with a margin. IEEE C37.102-2006 §4.3.3.1.1 states that about 1 % of the rated voltage is needed.
Why does it need supervision?
Because with the machine de-excited or stopped there is no third harmonic and the 27TN would see an undervoltage with no fault. The terminal-voltage supervision blocks it in that state.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws