Function 27/59: undervoltage and overvoltage

Definite-time undervoltage and overvoltage: pickup, reset, VT blocking, the relay inside and an injection test plan.

Siemens SIPROTEC 5§ 11.31overvoltageSiemens SIPROTEC 5§ 11.37undervoltageIEEE C37.2§ 2008function numbers

Example cases
Function 27/59: undervoltage and overvoltage

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings
V

Secondary voltage between phases below which it picks up.

s

Greater than 1: the 27 resets when the voltage rises above the pickup by this factor.

With the criterion on, the 27 picks up only if current flows: it does not trip with the breaker open.

A
E2Settings, part two
V
s
V
s
E3Simulation
V
A

The auxiliary contact of the VT circuit breaker blocks the 27: without it, an open VT looks like an undervoltage.

E4Installation and test set
V
A

Example value: enter that of your test set. Points that exceed it are marked.

V

Example value: enter that of your test set.

E5Relay tolerances
%
V
%
ms
ms

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Reset

—

Test plan

—

From the primary to the relay and the trip coil
  • Rating
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

The 27 trips when the voltage falls below a value and stays there for a time; the 59 when it rises. Both take the voltage from the bus or line VT and need no current.

The 27 is blocked when the VT circuit breaker trips: without that block, an open VT secondary looks like an undervoltage and trips the bay. A blown fuse has no auxiliary contact: the relay's measuring-voltage failure supervision detects it.

How it operates

  • The 27 picks up below the setting and resets when the voltage rises above the setting multiplied by its reset ratio, greater than 1.
  • The 59 picks up above the setting and resets below the setting times its reset ratio, less than 1.
  • With the current criterion on, the 27 picks up only if current flows, so it does not trip with the breaker open.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The plan injects a balanced three-phase set: each phase carries the phase-to-phase voltage divided by √3. It finds pickup and reset with ramps and measures the time at 80 % of the 27 setting and at 110 % of the 59 setting.

If stage 2 of the 59 already operates at that voltage, the plan marks it. At the end it checks that the 27 does not trip when the test set output activates the VT circuit breaker input.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • A balanced three-phase voltage is simulated; the single-phase, two-phase or three-phase modes of each relay are in its manual.
  • The times do not include the relay's own operating time.
  • IEC 60255-127 was not consulted: the tolerances are those of the cited manual.

Frequently asked questions

Why is the reset ratio of the 27 greater than 1?

Because the 27 picks up on low voltage: to reset, the voltage has to rise above the pickup. With a pickup of 92 V and a ratio of 1.05, it resets at 96.6 V.

What happens if the VT circuit breaker trips?

The voltage drops to zero and the 27 sees it as a real undervoltage. That is why the auxiliary contact of the VT circuit breaker is wired to the relay and blocks the 27. If the secondary is protected with fuses, which have no contact, the block comes from the relay's measuring-voltage failure supervision.

What voltage is applied to each phase?

With the phase-to-phase voltage divided by √3 and phase shifts of 120°: a setting of 92 V phase to phase is 53.1 V per phase.