Motor starting: voltage dip, current and starting time
See how the bus voltage drops and how long an induction motor takes to start, by source and method. Simplified nameplate study, not a dynamic one.
IEC 60034-12starting characteristics of squirrel-cage motorsIEEE 3002.7motor starting studiesNEMA MG 1locked-rotor code lettersIEC 60947-4-1thermal overload relay trip classesISO 8528-5diesel generator set in the transient state
Results
— %
— %
— A
— s
—
— s
— %
—
—
— A
— %
— s
—
— %
— kVA
— s
— A
Charts
- Busbar
- Motor terminals
- Chosen limit
- Line
- Motor
- Rated
- Motor in this start
- Motor at full voltage
- Load
- Motor in this start
- Motor at full voltage
- Highlighted method
- Other methods
- Rated current
- Highlighted method
- Other methods
- Chosen limit
- Minimum voltage
- Chosen limit
- Your generator
- Busbar
- Chosen limit
How it was calculated and standards
Step-by-step calculation
What it means for your installation
Need it for a real project? We carry out the full study, with its report.
What it is for
Motor starting is a study in its own right. It answers whether the motor starts, how much the bus voltage sags, how long it takes and whether the thermal relay trips. The four tabs show voltage and current over time, torque against speed, the comparison of the five methods and the diesel generator case.
The network is taken from the same data as the short-circuit tool. To carry it over from there, use the short-circuit power S″kQ of the bus; and to see the motor protection against the upstream protection, pass the relay setting to the coordination tool.
How it is calculated
IEC 60909-0network and transformer impedance
Source (per unit on the motor base)
ZQ = UnQ² / S″kQ · ZT = uk · Ur² / Sr · ZG = x″d · U2 / SGWith c = 1: in a motor starting study the source voltage is the operating voltage, and the c factor of IEC 60909 applies to fault currents. The network impedance is referred to the motor side with the rated transformation ratio. The generator uses its own resistance, 0.15 · X″d at low voltage.
Motor (current and torque against speed)
I(ω) with I(0) = Ia · Ir² ∝ T · s · I(ωN) = In · T(ωN) = TnThe rotor current follows from the torque equation, Ir² ∝ T · s, normalized to Ia/In at locked rotor and to the rated current at the rated point. The torque curve passes through the locked-rotor torque, the pull-up torque, the breakdown torque and the rated point. It is a single-circuit approximation: if you have the manufacturer's curve, that one governs.
NEMA MG 1code letterIEC 60947-4-1trip classes
Acceleration and relay
J · dω/dt = Tmotor · (m · V)² − Tload · ∫ (I / (7.2 · Ir))² dtSpeed is integrated step by step with the voltage the network leaves at each instant. The thermal relay is evaluated with the integral of (I/(7.2·Ir))² over time and compared with the trip time at 7.2 times the setting, between the lower and upper limits of the class. The code letter gives kVA per horsepower at locked rotor, and the calculation takes the upper end of the range.
Starting methods
- Direct-on-line: full voltage, the highest current and the highest torque.
- Star-delta: in star the motor sees 1/√3 of the voltage, a third of the line current and a third of the torque; it works if the load starts with little torque. The peak when switching to delta is not modeled with its transient.
- Autotransformer: with a tap k, the line current is k² of the direct-on-line value and so is the torque.
- Soft starter: raises the motor voltage along a ramp; the line current equals the motor current and torque grows with the square of the voltage. Starter harmonics are not modeled.
- Drive: limits the current and delivers torque through frequency; the network sees a current close to rated.
Limits of the calculation
- An induction motor with a single torque and current curve, approximated from nameplate data and typical values for NEMA design B or IEC design N motors; it does not replace the manufacturer's curve or data.
- Fixed-impedance source: the network, the transformer or the generator are represented by their impedance. In the diesel plant there is no voltage or speed regulator, so the calculated dip is more severe than the real one.
- A single bus and a single motor: other running loads or simultaneous starts are not added, and the control voltage of contactors and sensitive equipment is not modeled.
- The thermal relay is evaluated cold and without memory. Instantaneous and earth-fault protection are not checked: use the coordination tool.
- The minimum voltage limit is yours to choose: no standard sets it. To verify a real start, the dynamic study of the installation is required.
Frequently asked questions
How much current does an induction motor draw when starting?
With the rotor locked it draws five to eight times its rated current and keeps it while accelerating: the nameplate gives it as Ia/In or with a code letter in kVA per horsepower. The actual current depends on the voltage left at the terminals, and that depends on the network, the transformer and the cable.
Why does the voltage drop when a large motor starts?
The starting current flows through the network, transformer and cable impedance and produces a voltage drop across them. The weaker the source relative to the motor, the larger the dip. A diesel generator set has a much higher impedance than a distribution network, so it suffers more.
When is a soft starter or a drive worthwhile?
When direct-on-line starting pulls the voltage down more than the project allows, or when the load cannot tolerate a sudden torque. The soft starter limits the motor voltage along a ramp and keeps a lower current peak than direct-on-line. The drive delivers the current the torque demands and draws a value close to rated from the network.
We carry out your motor starting study
We model your system with the utility, transformer and motor data, verify the voltage dip and the starting time with each method and review the motor protection.
Related guides
Other tools
All tools (24)
Solar energy
Protection
ANSI / IEEE C37.2 device numbersPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt ramp
Analysis and communications
COMTRADE records: viewer and generatorIEC 61850 SCL viewerIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderInterlocking table and CILO equationsTechnical glossary
Equipment testing and diagnostics
Commissioning checklistInsulation diagnosis: dissolved gases (DGA) and temperature correction
Electrical studies
Short circuit and per-unit systemArc flashGrounding resistance
