Protection, control and substation engineering, done remotely.
Our team configures protective relays, recloser controls and substation communications, and designs and studies substations and industrial power systems, from medium to extra-high voltage. All of it remotely, worldwide, from Bogotá, Colombia.
Your relays, configured without travel.
Relays, reclosers, bay controllers and communications equipment: protection, control and P&C implementation, on blank devices or as changes to equipment in service, for the main brands on the market.
What we do remotely
For utilities, generators, EPC contractors and industry, with one technical lead from start to finish.
Remote relay configuration
Protection, control and communications configuration, from scratch or on existing equipment, for the main brands, without sending anyone to the substation.
- Protective relays and reclosers
- Control
- Communications
- Secondary engineering
Engineering design and studies
Primary, secondary (P&C) and communications engineering; feasibility, interconnection and pre-commissioning studies, protection coordination and power quality. From our office, worldwide.
- Primary engineering
- Secondary engineering (P&C)
- Communications engineering
- Technical, interconnection and commissioning studies
Brands we configure
Each brand has its own software and way of working. These are the ones with a dedicated page; tell us your model if it is not listed.
How we work
Tell us about your project
Send us the single-line diagram, the devices and the date you have in mind. If some information is missing, we organize it together.
We propose a plan
We review your information and send you a clear proposal: what we will do, how we will do it and how long it will take.
We work remotely
Through secure access that you authorize, or from the documents you send, and we keep you informed at every step.
Everything documented
You receive the configuration backups, drawings, reports and settings, ready for your utility or your reviewer.
Field work
Testing, commissioning and site measurements are done by our team in Colombia, or elsewhere on request. Abroad, your local crew can do the field work while we support them online.
Tell us about your project.
With the single-line diagram and the brand and model of your devices, we reply with scope and schedule.
Or email us:
[email protected]