Tiza Group

Home / Relay trip analysis

Remote · any brand

Remote analysis of protective relay trips

Your relay tripped and it is not clear why? We analyze it. Send us the event records and the oscillography of the trip and we will quote the analysis. A protection engineer on our team reviews the records and explains what the relay saw, whether it operated as it should and what to correct before you re-energize.

What you receive

A clear reading of the event, in engineering terms, with the conclusion in writing.

What the relay sawWe read the event report and the oscillography: which element picked up, which one tripped, how fast and with what currents and voltages.
Whether it operated correctlyWe tell you whether the protection operated as it should, tripped when it should not have (a misoperation) or failed to operate.
The most likely causeA real fault, transformer inrush, CT saturation, polarity, settings, logic or communications: whatever the records show.
What to check firstA short, ordered list of what to verify before re-energizing or changing a setting.

How it works

  1. 1
    Get in touch

    On WhatsApp or with the form. Tell us the brand and model of the relay and what happened, and we send you a quote.

  2. 2
    Send the files

    By email or through a download link. We treat them as confidential and use them only for this analysis.

  3. 3
    Results session

    In a video call, a protection engineer explains the findings with the waveforms on screen.

  4. 4
    Written report

    We send you the report with the conclusion and what we recommend correcting.

What we need from you

With this we can give you a useful answer. If something is missing, write to us anyway and we will see what can be read.

  • The oscillography files of the trip (COMTRADE, IEEE C37.111: .cfg and .dat) or the event report from the relay.
  • The brand, the model and, if you have it, the relay's current settings file.
  • The bay single-line diagram or a description of the circuit: what the relay protects and where its CTs and VTs are.
  • What happened around the event: time, switching, weather, ongoing work or earlier alarms.

If you need more afterwards

Many analyses end there: the relay operated correctly and it is enough to understand why. When you need to go further, we can correct settings and logic remotely or carry out a protection coordination study. We quote it separately, with a clear scope.

Frequently asked questions

What does a trip analysis cover?

The reading of the trip or blocking event: event report, oscillography and, if you send them, the current settings, with a technical conclusion based on the information we receive. Scope and price are confirmed in the quote.

What is not included?

Changing settings, connecting to your equipment or a protection coordination study. If you need them, we quote them separately with a clear scope.

Which brands do you work with?

The main brands of protective relays and recloser controls used in substations and industry. COMTRADE is a standard format, so we can read it regardless of the manufacturer.

What happens to my files?

We use them only for this analysis and do not share them with third parties. You can ask us to delete them when we finish.

Do you work outside Colombia?

Yes. The analysis is remote, so we can do it for companies anywhere in the world, in English or Spanish.

WhatsApp