Browse by topic
Other sections
Protection, control and communicationsEvery ANSI function, schemes and teleprotection, relays and reclosers by model, coordination, IEC 61850 and protocols, networks, control, SCADA and interlocking.Equipment, switchboards and substationsTransformers, circuit breakers, switchgear, switchboards, CTs and VTs, batteries and brand sheets; substation types, bus arrangements, earthing and station service.Testing, commissioning and faultsWhat each test is and its standard, protection testing and commissioning, and what to do after a trip, an alarm or a device that does not operate.Solar energyStandards and permits in Colombia, PV components, solar park design and storage, testing, switching and solar equipment by brand.Industry and automationWhat a plant needs: motors, drives and starting, PLCs and industrial networks, instrumentation and process control, functional safety, its substation and transformers, power quality and maintenance.Studies and designShort-circuit, load-flow, protection coordination, arc-flash and harmonic studies, and the electrical design of substations and industrial plants.Grid, regulation and connectionGrid connection requirements, the technical standards, load growth, smart grids, smart metering and electric mobility.