Home / Guides / Codes and grid connection: US, UK, CA, AU / Australia
Australia
Codes and grid connection: US, UK, CA, AU
MT/ATAEMO Generating System Model Guidelines: Data and ModelsWhat AEMO asks a new generator to submit: the Power System Model Guidelines, data sheets, R1 and R2 stages, network inputs and a worked fault level case.MT/ATAEMO PSS/E and PSCAD Model Requirements for IBRWhich models AEMO needs from solar, wind and battery plants: PSS/E and PSCAD, the version 36 change, acceptance tests, benchmarking and a worked example.BTAS/NZS 3000 Maximum Demand Calculation ExplainedAS/NZS 3000 maximum demand calculation explained: why demand is assessed, which methods the standard allows, and a worked example for a small building.BTAS/NZS 3000 MEN Earthing: Main Earthing ExplainedAS/NZS 3000 MEN earthing explained: where the neutral-earth link sits, how fault current returns, what the main earthing conductor does, with an example.BTAS/NZS 3000 RCD Requirements and Overcurrent ProtectionAS/NZS 3000 RCD requirements and overcurrent protection: what each device protects, how the two work together, with a leakage and nuisance-trip example.BTAS/NZS 3000 Wiring Rules Explained for EngineersAS/NZS 3000 wiring rules explained: how the 2018 edition is organised, what each section decides and how to size a circuit, with a three-phase example.BTAS/NZS 3008 Cable Selection and Voltage DropAS/NZS 3008 cable selection and voltage drop explained: current rating, derating factors, the voltage drop budget and a worked three-phase cable example.BTAS/NZS 4777: Inverter Grid Connection Standard GuideAS/NZS 4777 inverter grid connection explained: what Part 1 and Part 2 cover, who applies them, how DNSPs add conditions, with an export-limit example.BTAS/NZS 4777.2 Response Modes: Volt-Var and Volt-WattAS/NZS 4777.2 response modes explained: volt-var, volt-watt and the regional settings, how they limit voltage rise, with a worked curtailment example.BT/MT/ATAustralia Electrical Codes and Grid Connection GuideHow wiring rules, inverter standards and National Electricity Rules fit together for an Australian solar or storage project, and who reviews each piece.