Featured guides
Short-Circuit Study: Sources, IEC 60909 and ANSI/IEEEWhat a short-circuit study is, which sources feed a fault, how IEC 60909 and ANSI/IEEE differ, when it is required and what the deliverables contain.What a Protection Coordination Study NeedsInput data, stages, schedule drivers, deliverables and utility network approval in a protection coordination study. We can perform the study for you.Step and Touch Voltage: Difference and IEEE 80The difference between step and touch voltage, how IEEE 80 calculates the tolerable values and how grounding grids are designed to keep them within limits.Arc Flash PPE Categories: How They Are DefinedWhat NFPA 70E arc flash PPE categories 1 to 4 are, the minimum arc rating each one requires, and when to use the tables or an incident energy calculation.Low-Voltage Selectivity: Breakers and FusesHow selectivity is achieved in low voltage between breakers and between fuse and breaker: LSIG settings, manufacturer tables and IEC 60947-2 requirements.How to Reduce Arc Flash Incident EnergyHow to reduce arc flash incident energy: clearing time, maintenance mode, arc flash relays, zone selective interlocking, working distance and switchgear.Arc Flash Labels: What They Must SayWhat an arc flash label must show under NFPA 70E and NEC, where the data comes from, how far IEEE 1584 supports it and when to replace it. We do the study.Arc Flash Study: IEEE 1584 and NFPA 70EWhat an arc flash study is, when codes and insurers ask for one, how IEEE 1584-2018 calculates incident energy, and the PPE categories in NFPA 70E labels.
Browse by topic
Need a study or a design?We carry out short-circuit, coordination, arc-flash, load-flow and harmonic studies, and the electrical design of your project.
Engineering design and studiesOther sections
Protection, control and communicationsEvery ANSI function, schemes and teleprotection, relays and reclosers by model, coordination, IEC 61850 and protocols, networks, control, SCADA and interlocking.Equipment, switchboards and substationsTransformers, circuit breakers, switchgear, switchboards, CTs and VTs, batteries and brand sheets; substation types, bus arrangements, earthing and station service.Testing, commissioning and faultsWhat each test is and its standard, protection testing and commissioning, and what to do after a trip, an alarm or a device that does not operate.Solar energyStandards and permits in Colombia, PV components, solar park design and storage, testing, switching and solar equipment by brand.Industry and automationWhat a plant needs: motors, drives and starting, PLCs and industrial networks, instrumentation and process control, functional safety, its substation and transformers, power quality and maintenance.Grid, regulation and connectionGrid connection requirements, the technical standards, load growth, smart grids, smart metering and electric mobility.Codes and grid connection: US, UK, CA, AUElectrical codes and grid connection in the United States, the United Kingdom, Canada, Australia, Ireland and New Zealand, and how they compare.