MT, ATCT Selection: Burden, ALF and Saturation with an ExampleHow to choose a protection current transformer: ratio, class, cable burden, real ALF and saturation check, solved step by step.MT/AT/EATSpecifying Control and Protection PanelsWhat the purchase specification of a control and protection panel must say: scope, supply, wiring, communications, documents and tests.MT, AT, EATSecondary Design Deliverables: A Matrix by StageWhat documents the secondary design of a substation delivers at each stage (basic, detailed, as-built) and how to count them, with a 6-bay example.AT, EATProtection Redundancy: Main 1, Main 2 and Breaker FailureWhat must be independent in two main protections on a line bay, and how much the chance of not clearing a fault changes, with a worked example.AT, MTSubstation Protection and Control PhilosophyWhat the document that sets how a substation is protected and controlled must say, how to write it so it can be verified, and a clearing-time example.MT, AT, EATDC Supply Design for Redundant Protection SystemsHow to split two DC systems between Main 1 and Main 2 protection, and how to check voltage drop and branch tripping, with a worked example.ATProtection Schemes by Bay: Line, Transformer, CouplerWhat protection each bay of a 115 kV double-busbar substation needs, and how many relays, CT cores and trip coils the complete bay list adds up to.AT/EATIEC 61850 Substation Architecture: DesignHow to decide levels, networks and redundancy of an IEC 61850 substation, with a six-bay example: ports, network load and a cable cut.AT, EATTeleprotection Channel Selection and Logic TimingHow to choose a teleprotection channel (fibre, multiplexed, microwave, power line carrier, packet) and budget the clearing time.MT/AT/EATCentral or Distributed Interlocking: How to DecideCriteria for choosing between interlocking in a central controller or spread across the bay IEDs, with a seven-feeder and coupler example.