Tiza Group

Home / Guides / Studies and design / Protection coordination

Protection coordination

Studies and design

BT, MT, ATProtection Settings Report: Contents and FormatWhat the settings report of a protection study must contain and what each relay's settings sheet looks like, with a traceability example. We do the study.ATNERC PRC-027: Protection Coordination StudyWhat NERC's PRC-027 asks for when coordinating protection, how the primary and backup pairs of a study are counted, and a margin example.BT, MT, ATCommon Errors in Protection Coordination StudiesThe most common errors in a protection coordination study, how to catch them in a review and a checklist with worked numerical examples. We do the study.MTPeriodic Protection Coordination Review: When to Redo ItGrid, load and generation changes that outdate a coordination study, how to spot them with a quick calculation and which settings to fix first.BT/MT/ATCoordination Study Input Data: Request ChecklistWhat data to request for a coordination study: single-line diagram, short circuit, existing settings and CTs, and what to do when data is missing.MT/ATWorked Case: Coordinating a 10 MW Solar PlantNumerical example of coordinating a 10 MW solar plant with a step-up transformer: currents, inverter contribution, curves and times, step by step.MTInverter Fault Current and Protection SettingsWhy an inverter contributes little fault current and how that changes the 51 and 51V settings of a solar plant, in a 13.2 kV example. We do the study.MTMV Feeder Protection Plan: From Head to BranchHow a medium-voltage feeder is divided into zones protected by a relay, a recloser and fuses, with an example of reach and customers affected.MTWorked Case: 5 MVA Generator in Parallel With the GridWhy a generator's fault current falls below the 51 pickup, with the calculation for a 5 MVA generator and the pickup of the 51V.MT, ATValidating a Protection Study with Fault SimulationHow to check the trip times of a coordination study with a simulation program and compare them with the calculated time-current curves. We do the study.

Other topics in this section

WhatsApp