MT/AT/EATStep and Touch Voltage: Difference and IEEE 80The difference between step and touch voltage, how IEEE 80 calculates the tolerable values and how grounding grids are designed to keep them within limits.BT/MTArc Flash PPE Categories: How They Are DefinedWhat NFPA 70E arc flash PPE categories 1 to 4 are, the minimum arc rating each one requires, and when to use the tables or an incident energy calculation.BT/MT/AT/EATShort-Circuit Study: Sources, IEC 60909 and ANSI/IEEEWhat a short-circuit study is, which sources feed a fault, how IEC 60909 and ANSI/IEEE differ, when it is required and what the deliverables contain.BT, MT, AT, EATWhat a Protection Coordination Study NeedsInput data, stages, schedule drivers, deliverables and utility network approval in a protection coordination study. We can perform the study for you.BTLow-Voltage Selectivity: Breakers and FusesHow selectivity is achieved in low voltage between breakers and between fuse and breaker: LSIG settings, manufacturer tables and IEC 60947-2 requirements.BT/MTHow to Reduce Arc Flash Incident EnergyHow to reduce arc flash incident energy: clearing time, maintenance mode, arc flash relays, zone selective interlocking, working distance and switchgear.BT/MTArc Flash Labels: What They Must SayWhat an arc flash label must show under NFPA 70E and NEC, where the data comes from, how far IEEE 1584 supports it and when to replace it. We do the study.BT/MTArc Flash Study: IEEE 1584 and NFPA 70EWhat an arc flash study is, when codes and insurers ask for one, how IEEE 1584-2018 calculates incident energy, and the PPE categories in NFPA 70E labels.BT/MTIsolated vs. Grounded Neutral: Which Suits the PlantDifferences between isolated, solidly grounded, low- and high-resistance and reactance grounding: fault current, overvoltages, continuity and protection.First-Cycle Short Circuit: Motor ReactancesWhat current equipment withstands in the first cycle of a fault and the reactance given to each motor and generator per IEEE 141. We can run this study.