Substation testing and commissioning

Everything tested before energization. We test transformers, breakers, CTs, VTs, switchgear and cables; we verify every protection by secondary injection and end-to-end testing; and we support energization with the test records your utility asks for. We use test sets from recognized manufacturers (OMICRON, Doble, Baur and others) and issue one test report per device.

Field testing and commissioning are done by our team in Colombia, or elsewhere on request.

Insulation power factor measurement on a power transformer with a CPC 100 and a CP TD1.
Insulation power factor measurement on a power transformer with a CPC 100 and a CP TD1.

What is included

Primary equipment

The real condition of transformers, breakers, CTs, VTs, switchgear and cables, compared with the factory data, the nameplate and the standard.

  • Turns ratio, vector group and winding resistance
  • Power factor, capacitance and insulation resistance
  • Excitation current and short-circuit impedance
  • Ratio, polarity and knee point of CTs and VTs
  • Contact resistance and breaker timing
  • Applied voltage tests on medium-voltage switchgear, RMUs and cables
  • Fault location on buried cables, so you dig only at the fault
  • Testing of medium-voltage motors
  • Thermography of panels and substations

Protection

Every relay, of any brand, tested against the approved settings: functions, logic, trips and signals.

  • Secondary injection for overcurrent, distance, differential, voltage and frequency functions
  • Reclosing, breaker failure and interlocking
  • Teleprotection and line differential, end to end
  • Real trips on the breaker
  • Signals and events all the way to SCADA

Commissioning

From the last cable to energization: a test plan, a coordinated sequence and every open item closed.

  • Test plan and energization sequence
  • FAT and SAT
  • Verification of interlocking and signals
  • Support during energization
  • Test records organized for the utility

Solar plants and BESS

Transformer stations, switchgear, cables, BESS and the interconnection protection that the grid operator requires.

  • Transformer, switchgear and station service of each transformer station
  • Point-of-interconnection protection and anti-islanding, to the local grid code
  • Transfer trip and real trip of the interconnection breaker
  • Electrical side of BESS: transformer, switchgear and protection
  • Plant signals to SCADA

What you receive

Drawings and calculationsComplete, reviewable documents for your project.
Technical reportFindings and recommendations.
Follow-upWe walk you through the results and answer questions after delivery.

Reference standards: IEEE C57.152, IEC 60076-1, IEC 61869-2, IEC 61869-3, IEC 62271-100, IEC 62271-200, IEC 60255, IEC 60255-151, IEC 60255-121, IEEE C37.2, IEC 61850, IEC 60076-11.

Specialties

Commissioning

Protection testing

Primary equipment testing

Frequently asked questions

What do we receive when the tests are finished?

One test report per device with the measured values, the test conditions, the acceptance criteria and the result. If something does not comply, we tell you, with the observation and our recommendation.

Do you test only new equipment, or also equipment in service?

Both. We run commissioning tests on new equipment and diagnostic tests on equipment in operation, in substations and industrial plants. In both cases the equipment must be de-energized, isolated and grounded.

Do you do end-to-end tests on lines?

Yes. We coordinate the injection at both ends of the line to verify teleprotection and line differential protection, and we plan it with you and with the crew at the remote end.

Does the bay have to be taken out of service?

For secondary injection, the relay is isolated from the CTs, the VTs and the trip circuits through the test blocks. Real trips on the breaker are done with the bay locked out and tagged.

Are commissioning and putting into service the same thing?

In practice, yes. «Commissioning» covers the inspections, tests and verifications that prove the installation works as designed before it is handed over to operation. Some contracts separate pre-commissioning, without voltage, from commissioning with voltage; what defines the work is the scope written in the contract.

What test records do you deliver for the interconnection?

One report per device and per protection tested, with the measured values and the acceptance criteria, organized so you can submit them to the utility.

Do you work with the EPC contractor or directly with the owner?

With either. We fit into the construction schedule and coordinate the order of testing and energization.

Where do you do field testing?

In Colombia, or elsewhere on request. Abroad, your local crew can run the tests while we support them online, and we prepare the test plans and settings remotely.

Need it for your project?

Send us the single-line diagram, the equipment list and your target date, and we will reply with scope and schedule.