IEC 61850 SCL viewer

Open the substation SCD or the CID of an IED and see who publishes and who subscribes to each GOOSE and sampled value stream, with their addresses, datasets and a consistency review. The file never leaves your computer.

IEC 61850-6SCL language, 2007B4 schemaIEC 61850-8-1GOOSEIEC 61850-9-2sampled values

IEC 61850 SCL viewer
E1SCL file

.scd, .cid, .icd, .iid, .ssd or .sed (IEC 61850-6, editions 1, 2 and 2.1). You can also drag the file here.

Your file never leaves your computer. It is read by the browser (FileReader and DOMParser) and is not uploaded to any server or stored.

E2Filter

IED, control block, dataset, data (PTRC1.Tr), MAC or APPID. Not case or accent sensitive.

File review

—

SCL version

—

IED

—

Published GOOSE

—

Sampled values

—

Resolved subscriptions

—

Publisher → subscriber matrix
  • Subscription by ExtRef (number of inputs)
  • Only in the IEDName list
  • Input with a problem
Each row is a control block (GSEControl or SampledValueControl) with its publishing IED; each column, a receiving IED. The number is how many ExtRefs of that IED resolve against the dataset of the block. A dashed box means the publisher names the IED in IEDName but the IED has no bound inputs.

File review

    What it means

      GOOSE and SV plan

      TypePublisher / control blockDatasetgoID / smvIDDestination MACAPPIDVLANPrio.SubscribersReview

      Control blocks: dataset and subscribers

      Communication

      IEDs, logical devices and logical nodes

      Substation

      Header and history

      What it is for

      To review an IEC 61850 configuration file without opening the manufacturer's engineering tool: see which IEDs there are, on which subnetwork and with which IP, what each one publishes by GOOSE or sampled values, with which MAC, APPID and VLAN, and which IED receives each message. Use it to prepare GOOSE tests, review the SCD delivered by an integrator or find why a signal does not arrive.

      The sample SCD is synthetic, created by our team: a 115 kV line bay with a protective relay that publishes a trip GOOSE to the breaker merging unit, and a merging unit that publishes 4 currents and 4 voltages as sampled values to the relay. It validates against the SCL 2007B4 schema. You can download the .scd to try other programs.

      How it is calculated

      IEC 61850-6SCL 2007B4 schema

      Reading the file. The XML is parsed with the element and attribute names of the SCL schema: Header, Communication (SubNetwork, ConnectedAP, GSE, SMV and their P parameters), IED (AccessPoint, Server, LDevice, LN0, LN, DOI, DataSet, FCDA, GSEControl, SampledValueControl, Inputs and ExtRef) and Substation (VoltageLevel, Bay, ConductingEquipment and LNode). The type templates (DataTypeTemplates) are not read.

      VLAN = hexadecimal value of VLAN-ID (00A → 10)

      In SCL the VLAN-ID is written with three hexadecimal digits and the APPID with four; the MAC, with six octets separated by hyphens.

      Who subscribes to each message

      ExtRef (iedName, ldInst, prefix, lnClass, lnInst, doName, daName) ⊂ FCDA of the block dataset

      Each ExtRef of a subscribing IED is looked up in the publishing IED. If it has srcCBName (edition 2), it goes straight to that block and checks that the data is in its dataset. If not (edition 1), it searches for the GSEControl or SampledValueControl whose dataset contains the data: the logical device and logical node match, and the ExtRef data is inside the dataset member or contains it. A serviceType of Report or Poll is taken as an MMS read, not as GOOSE.

      IEC 61850-8-1GOOSE and SVIEC 61850-9-2

      Addresses. The address plan goes through the same rules as the GOOSE and SV address checker: MAC block 01-0C-CD-01 for GOOSE and 01-0C-CD-04 for SV, GOOSE APPID between 0x0000 and 0x3FFF and SV between 0x4000 and 0x7FFF, VLAN, priority and duplicates. It also checks that each access point IP is unique and that those on the same subnetwork are on the same IP network according to their mask.

      Estimated size of a GOOSE

      bytes ≈ 8 + PDU header (gocbRef, datSet, goID, counters) + Σ members

      GOOSE travels in a single Ethernet frame and is not fragmented, so the PDU has to fit in the 1500-byte payload. Without the data types, each basic attribute is counted as 7 bytes (an encoded FLOAT32), quality q as 5, timestamp t as 10 and a whole data object as 24 (stVal, q and t). It is an upper estimate: the exact value comes from the manufacturer's tool.

      Limits of the calculation

      • It is a viewer and a consistency review, not a validation against the XSD schema or the capabilities of each IED.
      • Without DataTypeTemplates it does not check that each data object or attribute exists in its type: dataset members and ExtRefs are resolved down to the logical node.
      • In a CID or ICD it is normal for ExtRefs to point to IEDs that are not in the file: they are flagged as warnings for you to check in the SCD.
      • ReportControl, LogControl and settings are not read. Substation functions and subfunctions are shown only if they sit inside a voltage level, bay or equipment.
      • A very large SCD, tens of megabytes, can take a while to open on a phone.

      Frequently asked questions

      How do I open an SCD or CID file without the manufacturer's software?

      Open this page, tap “Open SCL file” and choose the .scd, .cid, .icd, .iid or .ssd. The viewer reads the XML in your browser and shows the IEDs, the communication section, GOOSE and sampled values with their datasets and subscribers, and the substation if the file includes it. Nothing needs to be installed.

      How do I find who subscribes to a GOOSE in an SCD file?

      Subscribers are not in the GOOSE control block but in each receiving IED: they are the ExtRefs of its Inputs section. The viewer goes through every ExtRef, matches it against the datasets of each GSEControl and SampledValueControl and builds the publisher → subscriber matrix. The IEDName list of the block only says who it is intended for and may not match.

      Is it safe to open my substation SCD here?

      Yes. The file is read with FileReader and parsed with DOMParser inside your browser: the page does not send it to any server or store it. It is gone when you close or reload the page. The CSV you download is also generated on your computer.

      We configure your IEC 61850 system

      We engineer the SCD, assign addresses and VLANs, configure GOOSE, sampled values and reports in the IEDs and test each signal between publisher and subscriber. Remotely worldwide, or on site in Colombia and elsewhere on request.

      Other tools

      COMTRADE generatorCreate a COMTRADE fault record (.cfg/.dat or .cff) for your test set: fault, DC offset and breaker opening.ANSI / IEEE C37.2 device numbersDevice function numbers 1 to 94, common suffixes and their IEC 61850 logical node, with search.Relay coordinationUp to six relays, reclosers and fuses on a log-log plot, with the IEEE C57.109 damage curve, inrush and the coordination margin of each pair.Inverse-time curvesCalculator and log-log plot of the IEC 60255-151 and IEEE C37.112 curves, with the coordination margin.CT burdenLead resistance, relay burden and comparison with the rated burden of the current transformer.Short-circuit currentQuick estimate of the three-phase fault at the secondary of a transformer.COMTRADE viewerOpen .cfg/.dat or .cff fault records in your browser: waveforms, digital channels, cursor and RMS. The file is not uploaded.GOOSE and SV addressesCheck IEC 61850 multicast MAC, APPID, VLAN and priority, find duplicates and export the table as CSV.Process bus networkSV and GOOSE bandwidth, worst-case latency, PRP, HSR or RSTP redundancy and PTP time error of an IEC 61850 network.Interlocking table and CILO equationsInterlocking matrix per device, IEC 61850 EnaOpn and EnaCls equations, GOOSE signals between bays and FAT/SAT test cases per configuration.Per-unit base conversionBase current and impedance, conversion between %, pu and ohms, and change of base for transformers, generators and lines.Harmonic distortion THD and TDDVoltage THD and current TDD against the IEEE 519-2022 limits, with the spectrum as a bar chart.Symmetrical componentsPhase quantities to zero, positive and negative sequence and back (Fortescue), with phasor diagrams and what they mean for 46, 67Q and 51N.Vector group compensation (87T)TAP of each winding, phase compensation matrix, zero-sequence removal and the HV-to-LV clock diagram.Primary and secondary impedance (21)Primary to secondary ohms with the CT and VT ratios, line Z1, Z0 and k0, and zone reaches on the R-X plane.CT saturationRequired versus available voltage (5P/10P, PX or C class), time to saturation and the saturated waveform.DGA interpretationIEEE C57.104-2019 DGA status, Duval triangles 1, 4 and 5, IEC 60599 ratios and CO₂/CO of your transformer.Insulation temperature correctionInsulation resistance at 40 °C (IEEE 43) or 20 °C, PI, DAR and power factor of transformers and bushings, with the trend.Capacitor bankkvar to correct the power factor, steps of the automatic bank, capacitance and resonance with the transformer.Cable voltage dropΔV and % with R and X per km, copper or aluminium, mm² or AWG/kcmil, and the short-circuit check of the cable size.Battery sizingAh, number of cells and charger of a DC battery bank from its duty cycle, per IEEE 485 and IEEE 1115.Grounding resistanceGround rods, horizontal conductor and grid (BS 7430, IEEE 80), and soil resistivity from Wenner measurements.Technical glossarySubstation, protection and communications terms, explained in one or two sentences.
      WhatsApp