Surge protective device selection
Type the network, the lightning protection level, the equipment you want to protect and the data of each SPD. The tool checks the Uc, the effective protection level with its leads, the distance to the equipment, the current each stage must carry at its LPZ boundary and the coordination between stages, and simulates where the flash comes in.
IEC 62305-4:2010§ C.2.1effective protection level and distance to the equipmentIEC 62305-4:2010§ C.2.2SPD class by zoneIEC 62305-4:2010§ D.3.2sharing of the lightning currentIEC 62305-1:2010§ E.2expected currents per conductorIEC 61439-1:2011§ G.1withstand voltage by categoryRETIE§ 3.17.14installation and coordination of SPDsRETIE§ 2.3.12.1.2Uc of low-voltage SPDs
Results
—
—
—
—
Charts
- Service entrance conductor
- LPZ zone boundary
- Simulated flash
- Up/f of the stage
- Limit by the distance to the equipment
- Withstand voltage Uw
How it was calculated and standards
Stages
| Stage | Uc | Up/f | Limit | Current | Connection |
|---|
What it is for
To choose the low-voltage SPDs of a building, a plant or the auxiliary services of a substation by lightning protection zones, and to check that the set really protects the equipment: with the drop in the leads, the distance to the equipment and the coordination between stages, as RETIE requires.
What is calculated
Source: IEC 62305-4:2010, C.2.1
Effective level and distance
UP/F = UP + L · l · di/dt; UP/F ≤ UW, ≤ 0.8 · UW up to 10 m, ≤ (UW − UI)/2 beyondIn switching SPDs the larger of UP and the drop governs. The drop is only added at the entrance, where lightning current flows; the inner stages carry induced currents.
Source: IEC 62305-1:2010, E.2; IEC 62305-4:2010, D.3.2
Current of the entrance SPD
Iimp ≥ I · 0.5 / (n · n′), and not less than that of a flash to the service entranceI is the current of the protection level, n the services coming in and n′ the conductors of the service entrance. With level I, one service and three phases plus neutral: 25 kA per pole.
Source: RETIE, 2.3.12.1.2 b
Continuous operating voltage
UC ≥ 1.1 · UmaxLimits of the calculation
- Energy coordination is defined by IEC 61643-12: here it is checked with the cable length the manufacturer asks for or with its declaration. It does not simulate the curve of each varistor.
- A circuit of up to 1 m is taken as negligible, a Tiza criterion: the standard gives no figure.
- Low-voltage AC only. Medium-voltage, data and photovoltaic SPDs have their own standards.
- It does not replace the risk assessment of IEC 62305-2 or the manufacturer's data. The example cases are illustrative.
Frequently asked questions
Why is the entrance SPD not enough?
Because its protection level plus the drop in its leads, about 1 kV per metre, can exceed the equipment withstand voltage, and because in a long circuit the wave reflects and can double. A second SPD near the equipment lowers that level.
Which Uc do I ask for?
At least 1.1 times the maximum steady-state voltage across the SPD terminals, as RETIE requires: with 120 V and a 10 % tolerance, 145 V. In an IT system count the line-to-line voltage, because after a first earth fault the healthy phases sit at that voltage.
How are two stages coordinated?
By energy: the entrance stage must take most of the current before the next one is overloaded. It is achieved with the impedance of the cable between them or with products the manufacturer declares coordinated. RETIE requires coordinating them by energy and not only by current.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws
