Tiza Group

Home / Tools / Function 60C bank unbalance

Function 60C: capacitor bank unbalance

Unbalance of a double-wye bank: current between neutrals with blown fuses, critical step, alarm, trip and test plan.

IEEE C37.99§ 2000, 8.2bank unbalanceIEEE C37.99§ 2000, 8.3.4calculation with external fusesIEEE C37.2§ 2008function numbers

Example cases
Function 60C: capacitor bank unbalance

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings
A

CT secondary current between neutrals.

s
A
s
E2Settings, part two
Mvar
kV
E3Simulation

Units lost in the same parallel group of one phase.

Primary amps

Current between neutrals with no blown fuses, due to the unit tolerance. It is added in the worst direction.

E4Installation and test set
A
A

Example value: enter that of your test set. Points that exceed it are marked.

E5Relay tolerances
%
% of In
%
ms
ms

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Unit voltage

—

Test plan

—

From the primary to the relay and the trip coil
  • Rating
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

The 60C watches that the two halves of a double wye bank stay equal. When the fuse of a unit blows, that phase loses capacitance, the neutral shifts and current flows through the CT that joins the two neutrals.

The healthy units of the same group are left with more voltage. The alarm warns of the first fuse; the trip takes the bank out before the healthy units go above 110 % of their voltage.

How it operates

  • With n blown fuses in a group, the capacitance of the group drops to (Pa − n)/Pa, that of the phase a little less, and the neutral shifts in proportion.
  • The CT between neutrals does not see the unbalance of the network voltage, because both wyes feel it equally. It does see the inherent unbalance due to the unit tolerance.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The test set injects a single current into the input of the CT between neutrals. The plan finds the pickup and reset of the alarm and the trip, and measures their times.

After the test, check that the trip activates the close lockout of the bank.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • Only ungrounded double wye banks with external fuses and a CT between neutrals; other schemes have other equations.
  • Faults are assumed in a single group of one phase; faults in both wyes can compensate each other and go unseen.
  • The inherent unbalance is added in the worst direction; in the real bank it may add or subtract. Blown fuses are limited to Pa − 1.

Frequently asked questions

What is the critical step?

The number of blown fuses in a group from which the healthy units of that group are left with more than 110 % of their voltage. The trip is set halfway between the signal of that step and that of the previous one.

Why does the alarm go at half the signal of one fuse?

So that the inherent unbalance and measurement errors neither mask it nor trip it falsely.

How much current flows between neutrals?

Little: with 12 Mvar at 34.5 kV, 3 series groups and 8 units per phase in each wye, one fuse gives about 2.3 A primary and two fuses about 5.1 A. That is why the CT between neutrals has a low ratio.

Related guides

Other tools

All tools
WhatsApp