Function 66: starts per hour

Motor start inhibit: starts per hour, time between starts and since the stop, the relay inside and a test plan with the injection kit.

IEEE C37.96§ 2000 §8.3, §8.4.1starts per hourIEEE C37.96§ 2000 §5.2.8frequent startingIEEE C37.2§ 2008 §3.1.66function number

Example cases
Function 66: starts per hour

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings
A

The nameplate value divided by the CT ratio.

Those the motor manufacturer allows in one hour.

min

0 turns it off.

min

Lets the motor come to a full stop before starting again. 0 turns it off.

× FLA

Example value: enter the one of your relay.

E3Simulation
min
min
min
E4Installation and test set
A

Only to show the primary values.

A

Example value: enter that of your test set. Points that exceed it are marked.

E5Relay tolerances
%
cycles

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Starts in the window

—

Test plan

—

From the primary to the relay and the trip coil
  • Rating
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

Each start heats the rotor and the stator much more than running, and between successive starts the motor hardly cools. The 66 limits the starts so that the heat does not build up.

It does not trip the running motor: it closes a contact that blocks the start command until the needed time has passed.

How it operates

  • It counts the starts of the last hour; when they reach the allowed number, it inhibits until the oldest leaves the hour.
  • It also requires a minimum time since the last start and another since the stop.
  • The relay keeps the count even without supply, so a power loss does not erase the history.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The kit simulates each start with a current pulse above the current that counts a start, with 52a closed. Pulses are counted until the inhibit contact closes.

The inhibit times are long, minutes: measure with the kit timer on the input that reads the contact. Turn off the time between starts and the time since the stop while testing the hourly count: every pulse ends in a stop.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • With more than two starts in the hour, the intermediate ones are assumed evenly spaced between the oldest and the last.
  • The inhibit by thermal capacity, which depends on the relay thermal model, is not modelled.
  • The current that counts a start has no declared value in our sources.

Frequently asked questions

How many starts per hour are set?

Those the motor manufacturer allows. As a reference, the guide IEEE C37.96 recalls that motors are usually designed for two starts in succession from cold and one from hot.

Does the 66 trip the motor?

No: it blocks the next start. The running motor keeps working.

What is the time since the stop for?

So that the motor comes to a full stop before a new start, for example a pump turned backwards by the returning water.