Home / Tools / Oscillography analysis
Oscillography analysis
Open the COMTRADE record of the fault and enter the relay settings: the tool identifies the fault type, direction and distance, works out which functions should have picked up and how fast, and compares that with the trip and breaker opening in the record. The files never leave your computer.
IEEE C37.111COMTRADE formatIEC 60255-24COMTRADE formatIEC 60255-151inverse-time curvesIEEE C37.112inverse-time curvesIEEE PC37.114fault location
Results
—
— km
— ms
—
Charts
- Phase A
- Phase B
- Phase C
- Neutral
- Zones
- Line
- Phase A · sequence 1
- Phase B
- Phase C · sequence 2
- Neutral · sequence 0
- Record
- Expected
How it was calculated and standards
Functions and verdict
| Function | Measured | Setting | Multiple or index | Picks up | Expected |
|---|
Times, distance, sequences and direction
Times in the record
Location
| Loop | Primary Z | Secondary Z | Reactance | Takagi |
|---|
Symmetrical components
| Component | Pre-fault | Fail |
|---|
Direction
| Criterion | Angle | Direction |
|---|
Event report
What it is for
After a trip, the relay's oscillography record tells what happened: the bay currents and voltages, the instant of the trip and when the breaker opened. This tool reads that record in COMTRADE format and answers three questions: what fault it was, where it was and whether the protection operated as set.
You enter the CT and VT ratios, the line data and the settings of the 50/51, 50N/51N and 21 functions. The tool measures the fault with the same quantities as the relay, works out which functions should have picked up and their expected time, and compares it with the trip in the record. It also checks the breaker time.
How it is calculated
Phadke y Thorpone-cycle phasor
Phasors and secondary quantities
Isec = Iprim / CTR · Zsec = Zprim × CTR / VTRThe prefault and fault phasors are computed with a one-cycle window; the fault window starts one and a half cycles after inception and absorbs most of the dc offset. CTR and VTR are the CT and VT ratios. The symmetrical components I0, I1 and I2 give the fault type and, with the voltages, the direction.
IEC 60255-151inverse-time curve IEEE C37.112inverse-time curve
Expected overcurrent time
t51 = TMS · k / (Mα − 1) + top · t50 = tdelay + top · M = Isec / IpickupThe 51P uses the current of the highest phase and the 51N the residual current 3I0. IEEE curves have a different form: t = TD · (A / (Mp − 1) + B). top is the relay operating time up to the trip contact.
Phadke y Thorpmho characteristic
Self-polarized mho zone
Inside if |Z|² ≤ Re(Z · Zr*) · index = |Z|² / Re(Z · Zr*)Zr is the zone reach with its angle. The circle passes through the origin and has Zr as its diameter. An index of 100 % or less means the loop impedance falls inside the circle and the zone picks up; its expected time is the delay plus the relay operating time.
IEEE PC37.114loops and single-ended methods
Distance to the fault
Zloop = VA / (IA + k0 · 3I0) · mX = Im(Zloop) / X1L · mTakagi = Im(V · ΔI*) / Im(Z1L · I · ΔI*)For a ground fault the loop is compensated with k0 = (Z0L − Z1L) / 3Z1L; for a phase-to-phase fault the voltage and current between those phases are used. ΔI is the fault current minus the prefault current. The formulas are those of Zimmerman and Costello, who follow the IEEE PC37.114 guide.
Fortescuesequence networks
Direction and verdict
Forward if |∠(−V2/I2) − θ| < 90° · tolerance = max(trel · texp, tmin)With the fault in front of the relay, the negative- and zero-sequence sources are behind it and −V2/I2 has the angle of the source impedance. The verdict takes the fastest function that picks up and compares its expected time with the trip in the record: within the tolerance the operation is correct; outside it, slow or faster than expected.
Limits of the calculation
- The functions are textbook elements: self-polarized mho without memory or cross polarization, IEC and IEEE curves, definite time. It does not reproduce the logic of a particular relay, nor teleprotection, the 87 or the 67.
- Single-ended location is pulled off by fault resistance combined with load, zero-sequence mutual coupling, remote infeed and errors in the line data.
- The 51 currents are taken from the main fault window. If the current changes during the fault, through CT saturation or a changing infeed, the relay integrates a different current.
- The thresholds marked “Tiza” and the default tolerance are conventions of the tool. The example cases use a synthetic record made with the COMTRADE generator, not a real event.
Frequently asked questions
How do I know from a COMTRADE record whether the protection operated correctly?
The fault is measured in the record with the same quantities the relay uses, secondary amperes and ohms, and compared with the loaded settings. Each function that picks up has an expected time: its delay plus the relay operating time, or the time of its curve. If the trip in the record matches the fastest function within the tolerance, the operation was correct; if it comes late or early, check the actual settings or which other function tripped.
What is the difference between the reactance method and the Takagi method?
The reactance method divides the imaginary part of the loop impedance by the line reactance per kilometer. It is exact for a bolted fault, but fault resistance combined with load pulls it off. Takagi uses the superimposed current, the fault current minus the prefault current, to remove the effect of the load; that is why it needs at least one prefault cycle in the record.
Do my files leave my computer?
No. The .cfg and .dat, or the .cff, are read by the browser and analyzed on your computer. The page does not send them to any server or store them; if you close or reload the page, the record is gone.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws