Home / Tools / Secondary arc and single-pole reclosing
Secondary arc and single-pole reclosing
Enter the line, reactor and fault data: the tool calculates the secondary arc current and the recovery voltage of the open phase, the optimal neutral reactor, the estimated dead time and whether high-speed earthing switches are needed.
Geszti y Déri§ 1981secondary arc on long linesKimbark§ 1964neutral reactorIEC 60076-6§ A.4neutral reactor
Results
— A
— kV
— kV/m
— Ω
— s
—
Charts
- Healthy phases
- Coupling and arc
- Open phase
- Arc current
- Recovery voltage
- Reclose
How it was calculated and standards
Step-by-step calculation
What it is for
It estimates whether a single-pole reclosure will work: how much current feeds the secondary arc, what voltage remains on the open phase when the arc goes out and what gradient the insulator string sees. It calculates the neutral reactor that cancels the capacitive coupling and tells you when high-speed earthing switches are needed.
How it is calculated
Geszti y Déri§ 1981capacitor divider
Capacitive component
Ic = |ym|·V · Vr = V·|ym| / |2ym + yg| · ym = (B1 − B0)·l/3 − 1/Xpp · yg = B0·l − 1/XpeCircuit theoryinductive coupling
Inductive component
e = I·(X0 − X1)/3 · Ii = e·|B'·(b² − a²)/2 − b·yR + a·yS| · B' = (2B1 + B0)/3a and b are the distances from the fault to each end; yS and yR, the admittance of each bank seen by the open phase.
Kimbark§ 1964neutral reactor
Optimal neutral reactor
Xn = Xp² / (1/Bm − 3·Xp) · Bm = (B1 − B0)·l/3Empirical ruleestimate
Dead time
tdead ≥ textinction + (10.5 + kV/34.5)/60 sLimits of the calculation
- Transposed single-circuit line with lumped parameters: lines over 30 electrical degrees or double-circuit lines need an EMTP study.
- The capacitive and inductive components are added in the worst case; their real angle depends on the load flow.
- The arc extinction time is not calculated: it comes from a study or tests. Wind, arc length and the primary fault current change it.
- The duties the high-speed earthing switch must withstand are calculated with circuit theory; its class comes from the manufacturer.
Frequently asked questions
What is the secondary arc?
It is the arc that remains at the fault after opening the phase at both ends. The healthy phases feed it through the phase-to-phase capacitance and the mutual inductance. If it does not go out before reclosing, the breaker recloses onto the fault.
Why does the neutral reactor reduce the secondary arc?
Because the reactor bank with a neutral reactor is equivalent to phase-to-phase reactors that cancel the phase-to-phase capacitance. Without that coupling, the capacitive component of the current and of the recovery voltage almost disappears.
When are high-speed earthing switches needed?
When, even with the best possible compensation, the arc current or the recovery voltage gradient stays high. The switches earth the open phase at both ends, the arc loses its current and goes out; then they open and the breaker recloses.
We study the reclosing of your line
We calculate the secondary arc and set the single-pole reclosing with the data of your line.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws