Transformer winding resistance

Enter the readings of each tap and of the LV: the tool draws where the four test set leads go, corrects to the factory temperature, calculates each delta winding and compares between phases, against factory, against a sister unit and between taps.

IEC 60076-1:1993+A1:1999§ 10.1, 10.2reference temperature and measurementUSBR FIST 3-31:2003§ 15.1, 15.2, T8field criterion

Example cases
Transformer winding resistance

Only the basic data; the rest is taken with typical values.

ALearn

E0Equipment and test
E1Nameplate and temperature
°C
°C

With the transformer de-energized for at least 3 h, the winding temperature is the mean of the two (IEC 60076-1, 10.2.3).

°C
°C
mΩ
E2HV readings per tap
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
mΩ
E3LV readings
mΩ
mΩ
mΩ
mΩ
E4Connection in the drawing

In "I place them" choose the terminal of each lead: the tool tells you whether it is right.

Use a decimal point. The calculation runs in your browser and updates as you type.

Maximum difference between phases

—

Maximum difference from factory

—

Tap step

—

Test set connection

—

Test set connection on the equipment
Hover over a part to see its name. Yellow: what the test set energizes; white: what it measures; red: a lead connected wrongly. Change the phase, the tap or the connection mode in the data.
Corrected resistance per tap and terminal pair
  • Pair 1
  • Pair 2
  • Pair 3
  • Factory
Each line is one HV terminal pair. The diamonds are the factory value. Without a temperature, the chart shows the uncorrected readings.

Test planPro

Results sheetPro

Step-by-step calculation

What it measures

The test measures the DC resistance of each winding at each tap of the tap changer. It finds loose connections at the bushings or the tap changer, broken strands and tap changer contacts with extra resistance.

A value on its own does not say whether the winding is sound. It is compared between phases, against the factory values corrected to their temperature, or against a sister unit measured at the same temperature.

How it is connected

The test set (a micro-ohmmeter or winding ohmmeter) has two current leads, I+ and I−, and two voltage leads, V+ and V−. All four go to the same two terminals: I+ and V+ to one, I− and V− to the other, with the voltage clips inside the current clips. That way the voltage drop in the current leads does not enter the reading.

In a wye with neutral, each reading goes from the phase bushing to the neutral. In a delta, between each pair of bushings. A wye without a neutral bushing is measured between pairs, like a delta. The other terminals are left floating and the tank is grounded. The first reading is taken with the tap changer in the position it was found.

Corrections

To compare with the factory, the reading is taken to the reference temperature: Rs = Rm·(Ts + Tk)/(Tm + Tk), with Tk = 234.5 °C for copper and 225 °C for aluminium. IEC 60076-1 uses 75 °C for oil-immersed transformers.

The winding temperature (Tm) is taken as the mean of the top and bottom oil temperatures, with the transformer de-energized for at least 3 h. If you have the winding temperature, enter it and the tool uses it instead of the oil.

In a delta, each reading is one winding in parallel with the other two in series. The tool calculates the resistance of each winding from the three readings (equivalent wye); if they are equal, R = 1.5 × reading.

How to interpret it

USBR FIST 3-31 accepts a difference of up to 5 % between phases, from the factory or from a sister unit. Its Table 8 lowers the transformer's condition score between 5 % and 7 % and between 7 % and 10 %, and above 10 % asks for an evaluation before energizing.

The difference between phases is calculated as (highest reading − lowest reading)/lowest reading, among the three readings of the same tap.

A defect that shows at every tap of one phase points to the bushing, its connection or the winding. One that shows at a single tap points to the tap changer contact at that position: that is why the tool also checks that the tap step is regular (Tiza convention, 25 % of the median step).

After this test the core is left magnetized by the direct current. FIST 3-31 warns that this spoils the excitation current test: run it first, or demagnetize the core before measuring it.

Tool limits

  • Two-winding transformers in wye or delta with five taps on the HV side; zigzag windings and autotransformers are out of scope.
  • The factory value is entered in the same quantity as the reading (between the same terminals) and at the reference temperature; one per tap, for the three pairs.
  • The tap-step criterion is a Tiza convention for a linear tapped winding; with a reversing selector or uneven tap steps, check the result against the factory test report.
  • IEC 60076-1 edition 1993+A1:1999 was used; the edition in force is 2011.

Frequently asked questions

How much difference between phases is acceptable in winding resistance?

The USBR FIST 3-31 manual accepts a difference of up to 5 % between phases, from the factory or from a sister unit. Between 5 % and 10 % it lowers the transformer's condition score, and above 10 % there may be a serious problem that is evaluated before energizing.

Why is the reading between two bushings of a delta not the resistance of one winding?

Because between two bushings there is one winding in parallel with the other two in series. If the three are equal, the reading is 2/3 of one winding; the tool calculates each winding from the three readings.

Does the resistance need a temperature correction?

Only to compare it with the factory, which gives it at its reference temperature (75 °C for oil-immersed transformers per IEC 60076-1). To compare phases with each other, all are at the same temperature and no correction is needed.