Disconnector and GIS switchgear tests

Choose the equipment, outdoor disconnector or GIS compartment, and the test. Each sheet draws the equipment with the test-kit connection. Type your readings: the tool corrects them, compares them with the criterion and its source, and builds the plan with the results sheet.

USBR FIST 3-16§ 2.4contact resistanceUSBR FIST 4-1B§ 29.0disconnect switches

Example cases
Disconnector and GIS switchgear tests

Only the basic data; the rest is taken with typical values.

ALearn

E1Equipment

For the temperature correction.

°C
°C

That of the manufacturer's value. With both temperatures the resistance and the joints are corrected.

E2Contact resistance
A
µΩ
µΩ
µΩ
µΩ
µΩ

From the factory test report, if there is no manufacturer maximum.

µΩ
µΩ
µΩ
%

Against the previous test. Without a value, the change is for information.

E3Bolted joints
µΩ
µΩ
µΩ
µΩ
µΩ
µΩ
µΩ
E4Applied voltage
kV

That of your specification or of the manufacturer.

min

Without a value, 1 min is used as an estimate.

min
kV

Only to show the ratio between the two.

E5SF6 gas
MPa

Gauge, from the nameplate.

MPa
MPa
MPa

Gauge, at the gas temperature.

°C
ppmv
ppmv
%
%
E6Control
s
s
s
s
E7Test set connection

Use a decimal point. The calculation runs in your browser and updates as you type.

Contact resistance

—

Bolted joints

—

Applied voltage

—

SF6 gas or mechanism

—

Test set connection

—

Test plan

—

Contact resistance: micro-ohmmeter connection
  • Current
  • Measured
The current leads go outside and the potential leads inside. The path highlighted in green is the one measured. Below, the result of each pole against the criterion.
Resistance of a bolted joint
The potential probes straddle only the joint: the line connector on the terminal pad. Repeat at the same place in every test so the trend is useful.
Applied voltage: high-voltage source connection
  • High voltage
  • Ground
Magenta is energized and green is the insulation under test. The line conductors are disconnected and the frame or the enclosure is grounded.
SF6 gas of the compartment
The analyser connects to the test valve of the density monitor. The pressure read is referred to 20 °C at constant density and compared with the nameplate alarm and lockout.
Disconnector mechanism times
The order goes to the mechanism terminals and the timing channel measures when the main contacts close or open.

Test plan and results sheet

TestPointCriterionMeasuredStatusAgainst previousSource

What it is for

To prepare and review the field tests of an outdoor disconnector or of a GIS compartment. Each test opens on the drawing of the equipment with the test kit connected, so you see which lead goes to which terminal, what is energized and what is measured.

With your readings, the tool corrects for temperature, compares with the criterion and its source, follows the trend against the previous test and builds the test plan with the results sheet for the report.

What each test measures

USBR FIST 3-16§ 2.4contact resistance

Contact resistance

R = UP1−P2 / IC1−C2 · Rref = R · (k + Tref)/(k + T), k = 234.5 copper, 225 aluminium

It is the resistance of the current path of the pole: pads, blade, hinge and fixed and moving contacts. A high value points to worn, dirty or low-pressure contacts, and heats the pole under load.

Resistance of a joint

That of a bolted joint, for example the line connector on the terminal pad. It is compared with your specification, with the other similar joints and with the previous test measured at the same place.

Applied voltage

It checks that the insulation withstands the test voltage for the set time without disruptive discharge. In a GIS it reveals particles, transport damage and assembly errors before energizing.

SF6 gas

p20 = p(ρ, 20 °C) with ρ = ρ(pread, Tgas), real gas

Gas pressure changes with temperature, but the insulation depends on the density. That is why the reading is taken to 20 °C at constant density, as a compensated density monitor does, and compared with the nameplate alarm and lockout. Moisture and purity complete the check.

USBR FIST 4-1B§ 29.0disconnect switches

Disconnector mechanism

The closing and opening times are compared with the manufacturer's range. It also checks that the three blades close together, that the travel is complete, that the mechanical latch holds the closed position and that the interlocks work.

Criteria and sources

  • Resistance: the manufacturer's maximum governs. Without it, as an estimate, twice the factory value; without either, no pole more than 50 % above the lowest. Test current of at least 100 A. These are the criteria of FIST 3-16, section 2.4, written for circuit breakers.
  • Joints: the maximum of your specification. Without it, the tool shows how far each joint is from the lowest and the change against the previous test, with no pass or fail.
  • Applied voltage: the voltage and the duration are those of your specification. Without a typed duration, 1 min is used as an estimate, the time Shi et al. (2015) describe for the on-site test of a GIS.
  • SF6: the pressure at 20 °C against the manufacturer's alarm and lockout. Moisture and purity: the manufacturer's limit or, as an estimate, those of section 5.2 of SDI 545 (Endeavour Energy, 2014).
  • Mechanism: the manufacturer's time range and the checks of section 29.0 of FIST 4-1B.

Tool limits

  • It does not use the IEC 62271 or IEEE C37 standards: their values are not in the tool. Type those of your specification when you have them.
  • The temperature correction assumes a path of one metal. With silver-plated or mixed contacts it is approximate.
  • In a GIS with both earthing switches grounded, the path through the enclosure can end up in parallel with the contact and lower the reading.
  • The tool does not replace the site safety procedure or the manufacturer's instructions to connect and remove the grounds.

Frequently asked questions

What contact resistance is acceptable for a disconnector?

The one the manufacturer gives for that model. Without it, the tool uses as an estimate the criterion FIST 3-16 applies to circuit breakers: no more than twice the factory value, or no pole more than 50 % above the lowest. The comparison with the previous test completes the reading.

Why does the micro-ohmmeter have four leads?

Two carry the current and two measure the voltage. The voltage leads go inside, closer to the contact, so the drop in the current clamps and in the leads does not enter the reading.

How is the resistance of a GIS measured if the conductor is inside the enclosure?

Through the earthing switches: both are closed and the ground link of one of them, the one with the insulated terminal, is removed. The current then runs through the conductor and the contacts with no parallel path through the enclosure.

What voltage is applied in the on-site test of a GIS?

The one set by the project specification or the manufacturer, which you type in the tool. The test is done phase by phase, with the other phases to the enclosure, and it passes if there is no disruptive discharge during the test time.