Enter the data for the line, CTs and VTs, the following lines, the load and the channel. The tool calculates the zone reaches, residual compensation and fault resistance to cover, checks load encroachment and the R/X rules, and gives the teleprotection scheme times.
Siemens 7SA§ 6.6.9quadrilateralSiemens 7SA§ 6.6.10mhoSiemens 7SA§ 6.6.13zone settingSiemens 7SA§ 6.9teleprotection
Results
—
—
—
—
Charts
- Zones
- Line
- Minimum load
How it was calculated and standards
Step-by-step calculation
Loading these settings into a relay? We configure it remotely.
What it is for
Setting a distance protection means deciding how far each zone sees, how much fault resistance it covers and how fast it trips, without the load entering any zone. This tool does that calculation from your line, adjacent line, CT, VT and load data, and plots it on the R-X plane in secondary ohms, as you enter it in the relay.
It also gives the clearing times with teleprotection: which zone sends, which one trips and whether the blocking delay covers the channel.
How it is calculated
Siemens 7SA§ 6.6.9.2residual compensation
Residual compensation and conversion to secondary
Kr = (R0 − R1)/(3R1) · Kx = (X0 − X1)/(3X1) · Zsec = Zpri · CTR/VTRKr and Kx depend only on the line data, not on the fault location. The complex factor k0 = (Z0 − Z1)/(3·Z1) is the other way to set it.
Siemens 7SA§ 6.6.13stepped distance
Zone reaches
XZ1 = 0.8·XL · XZ1B = 1.5·XL · XZ3 = 0.8·(XL + 0.8·Xnext) · XZ4 = 1.2·(XL + Xlong)These are the factors of the Siemens 7SA manual example and can be changed. With intermediate infeed at the remote bus the relay sees ZL + (1 + I₂/I₁)·Zx, so a zone covers less of the next line.
Siemens 7SA§ 6.6.13.6arc resistance
Fault resistance to cover
Varc = 2500 V/m · 2d · Rff = 1.2·Rarc/2 · Rft = 1.2·(Rarc + (1 + Irem/Iloc)·Rtower)/(1 + Kr)The arc is taken with the minimum fault current. The phase-phase setting is half the loop resistance; the phase-earth one is divided by 1 + Kr because the setting is positive-sequence.
Siemens 7SA§ 6.6.5.2load cutout
Minimum load impedance
Zload,min = Umin/(√3 · Imax) · φload = arccos(pf)Siemens recommends setting the load cutout about 10 % below that impedance and with an angle about 5° larger, for phase-phase and earth loops.
Teleprotection
In PUTT, zone 1 sends and the receiving end trips with its zone 1B; no echo is needed. In POTT, zone 1B sends and trips; the weak-infeed end can return an echo so the other end trips. In blocking, a reverse or non-directional zone sends the signal that prevents tripping, and zone 1B trips if no signal arrives after the release delay, which must cover the channel time and the pickup difference between the two relays.
Limits of the calculation
- The quadrilateral shape is generic: sides parallel to the line angle, a top line tilted from the reach point and a directional boundary perpendicular to the line.
- The mho characteristic is drawn without polarization; with memory or cross polarization, the circle expands backward according to the source impedance.
- Mutual coupling of parallel lines, power swing blocking (68) and switch-onto-fault tripping are not calculated.
- The zone factors and times are those of the Siemens 7SA manual example; adjust them to your coordination study.
Frequently asked questions
How are the zones of a distance protection set?
With the reactance of the line and of the following lines. In the Siemens 7SA manual application example, zone 1 covers 80 % of the line with no delay, zone 1B 150 % for teleprotection only, zone 3 reaches 80 % of the line plus 80 % of the next one with a time step, and zone 4 reaches 120 % of the line plus the longest next line, non-directional. The tool calculates these reaches in primary and secondary ohms and lets you change each percentage.
What resistance must zone 1 cover?
That of the arc and, in earth faults, that of the tower footing. The Siemens manual estimates the arc voltage at 2500 V per metre of arc, with an arc twice the spacing between conductors, and adds a 20 % margin. In the phase-phase loop the setting is half the loop resistance; in phase-earth, the resistance divided by 1 + kr. Infeed from the remote end multiplies the tower footing resistance seen by the relay.
When does load encroach on the distance zone?
When the minimum load impedance point, with minimum voltage and maximum current, falls inside the quadrilateral or the circle. Siemens also asks you to check the earth loops and to set the load cutout about 10 % below that impedance, with an angle about 5° larger than the load angle.
What is the difference between PUTT, POTT and blocking?
In PUTT it sends the underreach zone (Z1) and the receiving end trips with its overreach zone. In POTT the overreach zone (Z1B) sends and trips, and the weak end can return an echo. In blocking, a reverse zone sends the signal that prevents tripping; without a signal, the overreach zone trips after a delay that covers the channel time and the pickup difference.
We set your distance protection remotely
We calculate the zones, compensation and teleprotection from your line data, check the load and load the settings into the relay, without travelling.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorMV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws