Home / Tools / Current split factor Sf
Split factor Sf and grid current
Enter the earth fault, the grid and what leaves the substation: lines with earth wire, feeders with neutral and cables with sheath. The tool calculates the reduction factor of each, the impedance of its chain, how much of the fault really enters the grid and the current IG for the grid design.
IEC 60909-3:2009§ 3.11, 3.12, 6.2, 7, 8.2.1, 8.3.1reduction factor and tower chainIEEE Std 80-2013§ 15.9, 15.10, C.2split factor and grid current
Results
—
—
—
—
Charts
- IEC 60909-3
- IEEE 80
How it was calculated and standards
Step-by-step calculation
What it is for
A substation grid is designed for the current that enters the ground, not for the whole earth fault. Earth wires, neutrals and cable sheaths carry part of it back to the sources. This tool calculates that split with IEC 60909-3:2009 and compares it with the IEEE 80 method.
The result is the grid current I<sub>G</sub> that the earthing resistance tool uses for touch and step voltages.
How it is calculated
IEC 60909-3:2009§ 7reduction factor
Earth wire reduction factor
r = 1 − Z′QL/Z′Q · Z′Q = R′Q/ν + ωμ0/8 + j(ωμ0/2π)(μr/4ν + ln δ/rQQ) · δ = 1.851/√(ωμ0/ρ)IEC 60909-3:2009§ 3.11, 3.12tower chain
Tower chain impedance
ZP = 0.5·ZQ + √(0.25·ZQ² + RT·ZQ) · ZQ = Z′Q·dT · DF = 3√(RT·dT)/Re√Z′QThe finite chain is solved span by span from the remote station, which is the same as equation 2 of the standard.
IEC 60909-3:2009§ 8.2.1, 8.3.1sheaths
Sheath reduction factor
r1 = R′S/Z′S · r3 = R′S/(R′S + 3ωμ0/8 + j3(ωμ0/2π)·ln δ/∛(rSd²))For a cable of length l to another grid ZE, the part returning through the ground is r′ = (Z′S − Z′SL)·l/(Z′S·l + ZE), which tends to r1 or r3 for a long cable.
IEC 60909-3:2009§ 6.2split at the station
Current entering the grid
U = Σ ri·3I0,i / (1/Rg + Σ 1/ZP,i + Σ 1/ZU,j) · Ig = U/Rg · Sf = |Ig|/3I0IEEE Std 80-2013§ 15.9, 15.10grid current
Comparison with IEEE 80 and the design current
Zeq = 0.5·Zs + √(Zs·Rtg) per circuit · Sf = Zeq/(Zeq + Rg) on the remote contribution · IG = Df·Sf·3I0Limits of the calculation
- The fault is at the substation busbar. A fault at a nearby tower can give more current to the grid; IEC 60909-3 covers it in its clause 6.4 and it is not calculated here.
- The contributions are added in phase. With the real angles from the short-circuit study the grid current is equal or lower.
- Buried pipes and other conductors bonded to the grid are not included, nor are double-circuit lines with coupling between them.
- For cables with steel armour the reduction factor is given by the manufacturer.
- The IEEE 80 method is the ladder reduction of its clause 15.9; the curves of its annex C are not reproduced.
Frequently asked questions
What is the split factor Sf?
It is the part of the earth fault current that actually enters the ground through the substation grid. The rest returns to the sources through earth wires, neutrals and cable sheaths, or through the local transformer neutral. With Sf you get the grid current IG = Df·Sf·3I0, which sets the touch and step voltages.
Why do IEC 60909-3 and IEEE 80 give different values?
IEEE 80 reduces each earth wire to a ladder impedance and splits the current between that impedance and the grid, without the coupling with the phases. IEC 60909-3 adds the reduction factor r: the phase current induces a return current in the wire, and only the part r·3I0 is left for the ground. That is why IEC gives a lower Sf and IEEE stays on the safe side.
What is the far distance DF?
It is the distance from the station beyond which the split between the wire and the ground no longer changes. IEC 60909-3 gives it in its equation 19 using the tower footing resistance, the span and the wire impedance. If the line is shorter than twice DF, use the finite chain with the remote station resistance.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws