Tiza Group

Home / Tools / Function 78 out-of-step

Function 78: out-of-step

Pole slipping: impedance locus, blinders and mho circle, stable or unstable swing, the relay inside and a test-set test plan.

IEEE C37.102§ 4.5.3.2out-of-stepSEL-700G§ p. 44tolerancesIEEE C37.2§ 2008function numbers

Example cases
Function 78: out-of-step

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings
Ω

Resistance in secondary ohms. The swing enters here when the generator leads the grid.

Ω

Leaving through this side confirms the slip. With 10 Ω and the example data it is crossed at 270°.

Ω

Toward the transformer and the grid.

Ω

Toward the inside of the generator.

s

A fault jumps from one side to the other almost instantly; a swing takes longer. Example value.

s
E2Settings, part two
Ω

In secondary ohms, like the other reactances.

Ω
Ω
E3Simulation
Hz

How fast the angle between the generator and the grid turns.

°
°
E4Installation and test set
V
A

Only to show the primary values.

A

Example value: enter that of your test set. Points that exceed it are marked.

V

Example value: enter that of your test set.

E5Relay tolerances
%
Ω
%
cycles
cycles

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Angle separation

—

Test plan

—

From the primary to the relay and the trip coil
  • Rating
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

When a generator loses synchronism, the angle between its internal voltage and the grid's keeps turning: each turn is a pole slip, with current and torque peaks that damage the shaft and the winding. The differential and the backup protection do not see it.

The 78 watches how the impedance seen by the relay at the terminals moves: in a slip it crosses the R-X diagram from one side to the other, and in a fault it jumps at once.

How it operates

  • With two sources of equal voltage the impedance moves along a line through the electrical centre, at half the total reactance between the two sources.
  • Two blinders parallel to that line and a mho circle bound the zone. There is a slip if the impedance enters through one blinder, takes longer than the minimum time and leaves through the other inside the mho.
  • A stable swing enters and comes back on the same side, and a fault jumps inside at once: neither of them trips.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The test set sets the impedance with three-phase voltages and currents: the plan gives the boundaries of each blinder on the electrical-centre line and the mho reaches on the X axis.

The time is measured with a test-set swing at the simulated slip frequency, from the load angle; two more points check that it does not trip on a stable swing or on a fault jump.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • The two sources have the same voltage; with different voltages the locus is a circle and the angles change.
  • The reactances are pure: neither the resistance nor the variation of X'd during the swing is modelled.
  • The swing is generated with a state file or an angle ramp of the test set; the tool gives the expected time, not the sequence.

Frequently asked questions

What is the electrical centre?

The point of the network where the voltage becomes zero when the two sources are 180° apart. With 12 Ω of X'd, 5 Ω of transformer and 3 Ω of grid, the total reactance is 20 Ω and the centre falls 2 Ω inside the generator.

Why not trip as soon as the impedance enters?

Because a stable swing also enters and then comes back. The 78 waits for it to leave through the opposite side, which confirms the angle went past 180°.

How is a fault told from a slip?

By the time between blinders: in a fault the impedance jumps inside within a cycle; in a 1 Hz slip it takes tens or hundreds of milliseconds to cross.

Related guides

Other tools

All tools
WhatsApp