Home / Tools / Function 51V voltage overcurrent
Function 51V: voltage-restrained overcurrent
Generator backup: voltage-restrained or voltage-controlled overcurrent, pickup that follows the voltage, the relay inside and a test-set test plan.
IEEE C37.102§ 4.6.1.2backup with 51VSEL-700G§ p. 44tolerancesIEEE C37.2§ 2008function numbers
Results
—
—
—
—
Charts
- Rating
- Active signal
- Characteristic
- Tolerance band and point
How it was calculated and standards
Test plan with injection test set Pro
| # | Test | Injection | Expected | Minimum | Maximum | Measured | Result |
|---|
What each parameter is
| Parameter | Value | What it does |
|---|
Loading these settings into a relay? We configure it remotely.
What it is for
The 51V is the generator backup for phase faults in the grid that nobody cleared. A plain overcurrent does not work: its pickup must be above the emergency overload, and the fault current of a generator falls in less than a second to a value near or below its rating.
The answer is to use the voltage: in a close-in fault the voltage drops a lot, in an overload it does not. The 51V becomes sensitive only when the voltage is low.
How it operates
- With voltage restraint (51VR) the pickup drops in proportion to the voltage, from the setting at full voltage down to a minimum, for example one quarter.
- With voltage control (51VC) a sensitive 51 stays blocked while the voltage is above the control threshold and is enabled when the voltage falls.
- A blown VT fuse would drop the measured voltage with no fault: the loss-of-potential logic (60) blocks the 51V.
The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.
Test plan
The plan searches the pickup at three different voltages: full, half and a very low one, and checks that the pickup follows the restraint line. Times are measured at half voltage at 2 and 5 times the pickup.
In the controlled mode it also searches the control voltage by lowering the voltage with twice the pickup. Finally it checks that it does not operate on the emergency overload and that test-set output 3 on BI3 blocks it.
Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.
Limits of the calculation
- The fault is simulated three-phase, with the same current and voltage in the three phases; the per-phase restraint of each relay is in its manual.
- The decrement of the generator fault current is not calculated: enter the sustained current from your study.
- The tolerances are those of the cited data sheet: enter the ones of your relay.
Frequently asked questions
Why does a normal 51 not work as generator backup?
Because its pickup must be 1.5 to 2 times the rated current so it does not trip on an emergency overload, and after half a second the generator fault current falls toward that of its synchronous reactance, which may be below the rating (IEEE C37.102-2006 §4.6.1.2).
What is the difference between voltage restraint and voltage control?
With restraint the pickup changes continuously with the voltage; with control there is a fixed, sensitive pickup that is enabled only when the voltage falls below the threshold.
How is the effective pickup calculated?
With linear restraint it is the setting times the measured voltage over the rated one, without going below the minimum. With a 6.3 A setting and 30 V of 115 V the pickup is 6.3 × 0.26 = 1.64 A.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws