Function 14: underspeed at start

Motor speed switch at the start: trip and warning delays, contact sense, the relay inside and a test plan with the injection kit.

IEEE C37.2§ 2008 §3.1.14underspeedIEEE C37.96§ 2000 §5.2.7speed switchSEL-710-5§ Specificationsspeed switch (14)

Example cases
Function 14: underspeed at start

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings
A

The nameplate value divided by the CT ratio.

s

Time from the start of the start-up within which the switch must report rotation. Shorter than the locked-rotor time.

s

0 turns it off.

× FLA

Example value: enter the one of your relay.

E2Settings, part two
s
E3Simulation
s
× FLA
E4Installation and test set
A

Only to show the primary values.

A

Example value: enter that of your test set. Points that exceed it are marked.

E5Relay tolerances
%
cycles
cycles

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Alarm

—

Test plan

—

From the primary to the relay and the trip coil
  • Rating
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

The 14 confirms that the rotor started turning. A speed switch on the shaft tells the relay when the motor passes a low speed; if no signal arrives when the delay runs out, the rotor is locked and the relay takes the motor out.

It is the answer for high-inertia loads, whose start lasts longer than the locked-rotor time: the current cannot tell a long start from a locked rotor, the rotation can.

How it operates

  • The relay recognises the start when the current exceeds the start current with the breaker closed, and starts the timer.
  • If input BI3 reports rotation before the delay, nothing happens; if not, it trips. An alarm with a shorter delay can warn first.
  • The contact sense is a setting: some switches close when turning and others, the zero-speed ones, open.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The kit simulates the start with a current step and the speed switch with one of its binary outputs on BI3.

The trip is measured without rotation; then check that it does not trip if rotation comes before the delay and that it does if it comes after. Block the 51LR and the 48, which see the same current.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • The switch is simulated as a contact that changes once; bounce and sensor failures are not modelled.
  • The current that recognises a start has no declared value in our sources.
  • The virtual speed switch some relays calculate is not modelled.

Frequently asked questions

Why is a speed switch needed?

Because with a high-inertia load the normal start lasts longer than the locked-rotor time: an overcurrent set to protect the rotor would trip on every start.

How is the delay set?

Longer than the time the rotor takes to pass the switch speed in a healthy start and shorter than the locked-rotor time the motor withstands.

Which number does it carry, 12 or 14?

IEEE C37.2-2008 calls the underspeed device 14; the guide IEEE C37.96-2000 numbers the zero-speed switch 12 in its figure. Use the one on your project drawings.