On-load tap changer dynamic resistance

Simulate the current the test set records while the diverter changes tap, see where each lead goes on the leg's winding and evaluate your measurements: transition time against the manufacturer, ripple, interruptions and differences between phases and operations.

Plath y Pütter, O Setor Elétrico, 2017§ —measurement methodTap changer manufacturer§ —transition time

Example cases
On-load tap changer dynamic resistance

Only the basic data; the rest is taken with typical values.

ALearn

E0Equipment and test
E1Transformer
E2Diverter simulation
Ω

The one the test set reads between the two terminals.

Ω
Ω
H

Adjust it until the simulated trace looks like the measured one; it drops a lot if the LV is short-circuited.

ms
ms
ms
A
V
V
Ω
mΩ
E3Measurements per operation and phase
ms
ms

From the tap changer manual or test report. Without a range, the time is for information only.

ms
%
ms
%
ms
%
ms
%
ms
%
ms
%
ms
%
ms
%
ms
%
E4Connection in the drawing

In "I place them" choose the terminal of each lead: the tool tells you whether it is right.

Use a decimal point. The calculation runs in your browser and updates as you type.

Current continuity

—

Maximum transition time

—

Simulated ripple

—

Test set connection

—

Test set connection on the equipment
Hover over a part to see its name. Yellow: what the test set energizes; white: what it measures; red: a lead connected wrongly. Change the phase, the tap or the connection mode in the data.
Current during the diverter transition
  • Simulated current
  • Stage change
  • Current before the operation
Circuit simulation with the E2 data. The vertical lines separate the stages: R1 alone, R1 and R2 bridging, R2 alone.

Test planPro

Results sheetPro

Step-by-step calculation

What it measures

The test records the direct current flowing through the HV winding while the on-load tap changer changes position. The trace shows the diverter switch sequence: the main contact opens, the current flows through the transition resistors and the contact closes on the new tap.

From the trace you measure the transition time, the current dip (ripple) and whether the current reached zero. An interruption means the path opened: a broken transition resistor, a loose connection or a contact that did not close.

How it is connected

It is the same four-wire connection as winding resistance: I+ and V+ on one end of the leg's HV winding, I− and V− on the other, with the voltage clips inside. The tank is grounded and the other terminals are left floating. The tap changer is operated with its drive while the test set records.

Which terminal pair is the winding of each leg depends on the vector group: in a Dyn11 leg A is H1-H2; in a YNd1, H1-H0. The drawing works it out and highlights the tap changer.

Corrections

The shape of the trace depends on the test set and the setup: the test current, the source voltage limit and the inductance it sees. If the LV is short-circuited, the inductance drops and the ripple grows. That is why a trace is only compared with another taken with the same setup.

The simulator lets you adjust the inductance, the source and the time of each stage until the simulated trace looks like the measured one. It is for understanding what changes the shape of the trace, not for deriving tap changer values.

How to interpret it

If the current reaches zero in any phase or operation, the result is Fail: in service the tap changer would interrupt the load current and arc.

The transition time is compared with the tap changer manufacturer's range. As a reference, Plath and Pütter quote typical switching times of 40 to 60 ms, but the criterion is always the one of your tap changer's manufacturer.

Differences between phases of the same operation and between operations of the same phase are flagged for review with the Tiza convention (10 % in time, 50 % in ripple). They point to contact wear or misadjustment and call for comparison with the equipment's history.

Tool limits

  • The simulator models a resistor-type diverter switch with two equal transition resistors. Reactor-type tap changers and vacuum ones with other sequences are not simulated; their measurements can still be evaluated.
  • The winding inductance is taken as constant during the operation; in reality it changes with core saturation and with the number of turns of the tap.
  • On a delta HV winding, part of the test current flows through the windings of the other two legs and through their diverters: the trace mixes the switchings of the three phases. If the test set allows it, inject phase by phase to separate them.
  • On an HV wye without a neutral bushing (Yd1, Yd11, Yy0, Yyn0) the current enters through one bushing and leaves through the next: there are two arms of the wye and two diverters in the path.
  • There is no ripple limit taken from a standard: only the differences between phases are flagged with the Tiza convention.

Frequently asked questions

What is the dynamic resistance of a tap changer?

It is the record of the direct current flowing through the winding while the on-load tap changer moves from one tap to another. The shape of the trace shows when the main contact opens, when the transition resistors come in and when the contact closes on the new tap.

When is a dynamic resistance trace bad?

Whenever the current reaches zero: the path opened and in service the tap changer would interrupt the load current. The transition time is judged against the manufacturer's range, and the differences between phases and between operations show what to review.

Why does the ripple change from one test to another?

Because it depends on the inductance the source sees and on its voltage limit. If the LV is short-circuited, the inductance drops and the ripple grows. Always compare traces taken with the same setup, the same test set and the same current.