Home / Tools / 87 differential setting
Setting the 87T, 87N and 87B differential
Choose the function. For the 87T, enter the transformer and CT data: the tool calculates the TAP and compensation, plots the characteristic and the fault points, and checks harmonic blocking and CT saturation. For the high-impedance 87N and 87B, it calculates Vs, Rs, the operating current, the required knee point and the peak voltage.
SEL-387A§ 3characteristic and maximum errorSiemens 7UT6x§ 2.2.7settings and harmonicsGE P14x§ 9high impedanceIEC 61850-7-4:2010logical nodes PDIF and PHIZ
Results
—
—
—
—
Charts
- Characteristic
- Unrestrained stage
- Actual current
- Ideal current
How it was calculated and standards
Step-by-step calculation
Loading these settings into a relay? We configure it remotely.
What it is for
Differential protection compares the current entering its zone with the current leaving it. If the transformer, neutral or busbar is healthy, the difference is almost zero; an internal fault creates a difference that the relay recognises. Its setting has three tasks: match the currents (CT ratio and vector group), cover the errors without losing sensitivity (slope), and not mistake inrush or overexcitation for a fault (harmonics).
This tool does those three tasks with the data of your transformer and CTs, and checks whether an external fault with a saturated CT stays inside the restraint region. For busbars and restricted earth fault protection, it calculates the high-impedance setting, which is stabilised by a voltage instead of a slope.
How it is calculated
SEL-387A§ 3TAP and compensation
Tap of each winding
TAP = S·1000 / (√3 · UkV · CTR) · CS in MVA, U the winding line-to-line voltage and CTR the CT ratio. C is 1 with wye-connected CTs and √3 with delta-connected CTs. The tool reuses the calculation from "87T vector group compensation": the matrix that rotates the currents according to the vector group and removes zero sequence when there is no earth path inside the zone. SEL-387A requires the ratio of the largest to the smallest TAP not to exceed 7.5.
SEL-387A§ 3maximum error, pp. 3-21 to 3-23
Tolerance the slope must cover
ε = (2e + a + a·e)/(1 + a) + excitation + relay errore is the CT error and a the tap changer range, as a fraction. With e = a = 0.1, the error from CT and tap changer is 28.18 %; adding 3 % for excitation and 5 % for the relay, SEL-387A reaches 36 %. In an external fault of current I, the expected differential current is ε·I.
Siemens 7UT6x§ 2.2.1Idiff and Irestraint GE T60§ 5.7.6.2restraint
Differential and restraint current
Idiff = |I1 + I2| · Irest = |I1| + |I2| (Siemens) · (|I1| + |I2|)/2 (SEL) · max(|I1|, |I2|) (GE)The currents are the already compensated ones, in per unit. Each brand defines restraint in its own way, so a Siemens 25 % slope is not equivalent to a GE 25 % slope. For a through current I, restraint is 2I in Siemens, I in SEL and I in GE. Choose the convention of your relay.
Siemens 7UT6x§ 2.2.7harmonics SEL-387A§ 3PCT2, PCT5
Harmonic blocking
blocks if I2f/If > 2nd harmonic setting · or I5f/If > 5th harmonic settingThe 2nd harmonic identifies inrush current; the 5th identifies overexcitation. Values from the manuals: Siemens 15 % and 30 %, GE 20 % and 10 %, SEL 15 % and 35 % (suggested). Harmonic blocking does not affect the unrestrained stage.
Stability with saturated CT
In an external fault with asymmetrical current, a CT can saturate because of the DC component and remanence. If one CT saturates and the other does not, the false differential current can become almost equal to the fault current. That is why the tool calculates two things with the "CT saturation" engine: the time it takes to saturate (IEEE C37.110-2007 criterion) and whether the knee point is sufficient for Ktd·(If/N)·(RCT + burden), the SEL criterion form with the Siemens transient factor.
The "saturated CT" point plots the worst case explicitly: Idiff = (1 − delivered fraction)·I. If it falls above the characteristic, the relay depends on its saturation detector or on a high second slope (GE recommends 98 %). This is not a tool error: it is the reason those mechanisms exist.
High impedance
GE P14x§ 1.1Vs
Stabilising voltage and resistor
Vs ≥ K · If · (RCT + 2RL) · Rs = Vs/Ir − RrIf is the largest external fault current in the CT secondary, RL the one-way resistance of the farthest lead and K a constant that depends on the application (1.0 and 1.2 in the GE P14x examples). For fault X/R up to 25 there is an advanced method, Vs = (0.0123·X/R + 0.68)·If·(2RL + RCT), used when it gives less than the equation with K = 1.0; it lowers the knee point needed.
GE P14x§ 1.3Iop
Primary operating current and knee point
Iop = CTR · (Ir + n · Ie) · VK ≥ 4 · Vsn is the number of CTs in parallel and Ie the excitation current of each one at voltage Vs. On busbars, the operating current must be less than 30 % of the minimum fault and greater than the full load of the largest circuit.
GE P14x§ 7peak voltage and Metrosil
Peak voltage in an internal fault
Vp = 2√2 · √(VK · (Vf − VK)) · Vf = If · (RCT + 2RL + Rs + Rr)If Vp exceeds 3,000 V peak, a varistor (Metrosil) is connected across the relay and its resistor. In the REF of a transformer or a generator the fault current is limited by the impedance and it is normally not needed.
Limits of the calculation
- The factory values are those of the cited manuals, in the versions indicated (Siemens 7UT6x V4.67, GE T60 7.3x, SEL-387A 2007). Newer relay versions may have different ones. No ABB default value was verified.
- The characteristic has three shapes: branches from base points (Siemens 7UT6x), slope from the origin (SEL-387A) and two breakpoints (GE T60), whose spline transition is approximated with a straight line. It does not model the overload zone of some relays. GE settings are converted to this tool's base with the ratio between the CT of the reference winding and its rated current.
- The saturation detector, the dynamic additional restraint (Siemens) and the external-fault algorithm (SEL) are not modelled. The tool tells you when a fault with a saturated CT would fall outside the slope restraint and depend on them.
- The inrush and overexcitation data, the CT excitation current, the fault currents and the errors are yours: no standard fixes them. The example cases are illustrative, except the two that reproduce the GE P14x examples.
- It does not replace your relay settings or the coordination study. IEC 60255-187-1:2021 and IEEE C37.91-2021 were not consulted.
Frequently asked questions
What slope should be set on a transformer differential?
The slope must cover CT error, the tap changer range, excitation current and relay error. SEL-387A calculates 28.18 % from CT and tap changer alone (CT ±10 %, tap changer 90-110 %) and 36 % with excitation and relay error; with a CT error of 1 %, it uses a first slope of about 25 %. This tool adds up those errors with your data and shows you the external fault point on the characteristic.
Why can the differential trip for an external fault?
Because a CT can saturate from the DC component and remanence, and then the relay sees a differential current that does not exist. The GE T60 manual states that, with one saturated CT and one that is not, the Idiff/Irestraint ratio can reach 95-98 %; that is why the second slope is set high and relays have saturation detectors. The tool calculates the time the CT takes to saturate and compares it with the time-to-saturation you specify.
When is high-impedance protection used, and what settings does it need?
On busbars and in restricted earth fault protection, when CTs with the same ratio and similar magnetising characteristics are available. You set a voltage Vs above K·If·(RCT + 2·RL), using the external fault current and the resistance of the winding and of the farthest lead; a stabilising resistor Rs = Vs/Ir; and a CT knee point of at least 4 times Vs. If the peak voltage in an internal fault exceeds 3,000 V, a varistor (Metrosil) is connected.
We set your differential remotely
We review your transformer and CT data, calculate the TAP, slopes, blocking and high impedance, and load the settings into the relay, with no travel.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BFCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws