Auxiliary services control simulator
Simulate the automatic transfer between the station-service transformer and the diesel set, and the DC charger and battery with their alarms.
IEEE 946-2004DC auxiliary systems: charger, alarms and ground detectionIEC 60947-6-1Low-voltage transfer switching equipment (cited in the guide)IEEE C37.2Device numbers 27, 43, 47, 52, 64, 72 and 83
Results
—
—
—
—
Charts
- Rating
- Control wiring
- Live
- Rating
- Control wiring
- Live
- Rating
- Control wiring
- Live
How it was calculated and standards
Event log server
| t (s) | Signal or command | Status |
|---|
Functional tests of the control circuit
| # | Test | Acceptance criterion |
|---|---|---|
| 1 | Real loss of the normal source with the load connected | It transfers after the loss delay, starts and stabilizes the set, and the two sources are never closed together. |
| 2 | Dip shorter than the loss delay | No transfer and no start of the set. |
| 3 | Return of the normal source | It retransfers only when the normal source stays within limits for its delay; the set cools down and stops. |
| 4 | Selector in manual and hand closing of the open source | The controller does not act; the interlock prevents closing with the other source closed. |
| 5 | Failure of the charger and of its AC supply | The battery takes the load without interruption; the failure alarm and the bus undervoltage alarm reach the RTU. |
| 6 | Simulated ground on each polarity | The 64 alarms at the set resistance and shows the polarity. |
Replay them in the simulator with the “Test” field and with the live controls.
What it is for
A substation lives on its auxiliary services: AC runs chargers, motors and ventilation, and DC keeps protection and control working. This simulator draws both parts and their logic, and lets you operate them live.
Remove the normal source, keep the set from starting, put the selector in manual, fail the charger or apply a ground, and see which contact opens, which alarm comes up and why an order does not reach the coil.
How it operates
- Controller 83 supervises each source with a 27 relay. If the normal source is out of limits for longer than the loss delay, it starts the set, waits for its voltage to settle, opens 52-1 and, after the neutral position, closes 52-2.
- The two breakers never close together: the b contact of each one is in the closing circuit of the other, and there is also a mechanical interlock. With the selector in manual the controller gives no orders and the pushbuttons are in command.
- When the normal source returns and stays within limits for the return delay, the controller opens 52-2, closes 52-1 and leaves the set running unloaded for the cool-down. If the alternate fails while that delay runs, it returns at once, as commercial controllers do.
- On the DC side, the charger feeds the load and floats the battery. If the charger fails or loses its AC supply, the battery takes the whole load and the bus voltage drops from float to discharge voltage: the undervoltage alarm, set near the open-circuit voltage, warns at once.
- If nobody acts, the battery discharges to the minimum system voltage and its alarm comes up. With a minimum-voltage contactor, the battery is disconnected and the DC bus is left dead, with everything that depends on it.
Limits of the calculation
- This is a principle scheme, not a manufacturer drawing. Your board may have a bus tie, two transformers, closed transition or other conditions: compare with your drawings.
- The DC bus is drawn as one line for both poles. The discharge curve is a straight line between the starting and the minimum voltage; the real one is the manufacturer's.
- Equalize and boost charging, temperature compensation and load sharing between two chargers are not simulated.
- The return and cool-down delays are short so you can see them in the simulator. On site they are usually minutes.
Frequently asked questions
Why does the transfer wait for a delay before acting?
So that it does not transfer on short dips, such as those of a cleared external fault or a network reclose. The delay is set above those times and according to what the loads tolerate.
Why is the DC undervoltage alarm not set at the minimum voltage?
Because it would come too late. IEEE 946 recommends setting it slightly below the open-circuit voltage of the battery: it then warns as soon as the battery starts to deliver energy, with time to correct.
Does a ground on the positive take the DC out of service?
No. The system is ungrounded and the first fault only alarms. The risk is a second ground on the other pole or in the wiring of a coil, which can trip or prevent an operation.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws