Function 48: incomplete sequence

Prolonged motor start: maximum starting time, end-of-start current, 48A alarm, the relay inside and a test plan with the injection kit.

IEEE C37.96§ 2000 §5.8.1, §7.2.8incomplete sequenceSEL-710-5§ SpecificationstimersIEEE C37.2§ 2008 §3.1.48function number

Example cases
Function 48: incomplete sequence

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings
A

The nameplate value divided by the CT ratio.

s

Normal motor starting time with a safe margin added.

× FLA

Below this current the relay takes the start as finished. Example value: enter the one of your relay.

E2Settings, part two
s

The one of the starting study at the lowest expected voltage.

s

Given by the motor manufacturer.

E3Simulation
× FLA
s

Time until the current falls below the end-of-start current. Longer than normal: low voltage or jammed load.

× FLA
E4Installation and test set
A

Only to show the primary values.

A

Example value: enter that of your test set. Points that exceed it are marked.

E5Relay tolerances
%
% of In
%
cycles
cycles

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Margin over the start

—

Test plan

—

From the primary to the relay and the trip coil
  • Rating
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

The 48 checks that the start finishes in time. With low voltage or a jammed load, the motor takes longer to reach its speed and spends more time at starting current, which heats it a lot.

If the start has not finished when its time runs out, it takes the motor out and locks it out, or only alarms when used as 48A.

How it operates

  • The timer starts with the start, when the current rises from zero with the breaker closed.
  • The relay takes the start as finished when the current falls below the end-of-start current.
  • The setting is the normal starting time plus a safe margin; if it ends up above the locked-rotor time, the 48 does not protect a locked rotor.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The kit simulates a start: a current step from zero with 52a closed. If the current stays above the end-of-start current, the 48 must operate in its time.

Then repeat lowering the current before the time: it must not operate. Block the 51LR, the 14 and the thermal element during the test, as they see the same current.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • The start profile is simplified: constant current to the end, then the running current.
  • The end-of-start current has no declared value in our sources: enter the one of your relay.
  • The element's own time is added as an estimate.

Frequently asked questions

How is the 48 set?

With the normal starting time of the study, at the lowest expected voltage, plus a safe margin so it does not trip on healthy starts.

Does the 48 replace the 51LR?

No. If the starting time is longer than the locked-rotor time, the 48 is too late for a locked rotor: there the 51LR, the thermal model or the speed switch act.

What is the 48A?

The same function connected for alarm only, without trip.