Tiza Group

Home / Guides / Protection / Protection functions

Locked Rotor 51LR and Incomplete Sequence 48 Protection

ANSI 51LR/48

Motor locked rotor (51LR), prolonged start or incomplete sequence (48) and starts-per-hour (66) protection: how they work, settings and why they trip.

By Shadai García, electrical engineer, founder and CEO of Tiza Group. Reviewed by the Tiza Group engineering team · .

MV buscontactorMloadjammed14: zero speed48 51LR66 49restart blockedmotor stalledlocked rotor: current stays highrelay picks uptrip: opens the contactor66: restart blockedItnormal startstart timetrip51LRsafe timelocked rotor48 and 51LR are current functions: no VTSequenceStart48 supervisionLocked rotor 51LRTrip66 block© tizagrp.comMV buscontactorMloadjammed14: zero speed48 51LR66 49restart blockedmotor stalledlocked rotor: current stays highrelay picks uptrip: opens the contactor66: restart blockedItnormal startstart timetrip51LRsafe timelocked rotor48 and 51LR are current functions: no VTSequenceStart48 supervisionLocked rotor 51LRTrip66 block© tizagrp.com
Locked rotor protection: 48 and 51LR versus safe stall time. Location in the system, operating principle and IEC 61850. Illustrative: actual values come from the nameplate and the manufacturer's manual.
Short answer

An induction motor with a stalled rotor draws its locked rotor current, and the rotor heats up in seconds. Locked rotor or jam protection (51LR) and incomplete or prolonged start protection (48) trip when the motor does not accelerate within the safe stall time given by the manufacturer, or when it jams while running. Function 66 limits successive starts. They are set from the motor thermal limit curve and the actual starting time, and every relay manufacturer groups and names them differently.

What 51LR, 48 and 66 protect

When an induction motor starts, or when its shaft jams, the rotor is at standstill and the motor draws its locked rotor current, several times rated current. Under that condition almost all the energy becomes heat in the rotor bars, which get no ventilation because the motor is not turning. The manufacturer states this limit as the safe stall time (safe locked rotor time), cold and hot: the seconds the motor withstands at standstill at full voltage before it is damaged.

Three functions of the motor protection relay look after that limit:

FunctionName (IEEE C37.2 and use in motor relays)What it detects
48Incomplete sequence relayThe motor does not finish starting within the expected time
51LRLocked rotor or jam overcurrentSustained high current with the rotor stalled or slowed down by the load
66Notching or jogging device (starts per hour)More successive starts, or starts per hour, than the motor allows

The suffix “LR” is not a number from the C37.2 list: manufacturers and studies use it to tell this application apart from general 51 overcurrent. That is why the same relay may show these functions grouped together; ABB, for example, groups start supervision under “49, 66, 48, 51LR” in the REM630 documentation and calls another function, also labelled 51LR, stall (jam) protection.

How they work

Start supervision (48). The relay detects the start (current rises above a threshold, or the contactor closes) and starts timing. If the current has not dropped close to running current before the set time, it trips. Some relays integrate the starting current as I²t instead of using a fixed time, which accounts for the lower current and longer start at reduced voltage.

Locked rotor or jam (51LR). With the motor already running, a load that jams (a mill that chokes, a conveyor that gets stuck, a pump with a foreign object) drives the current up towards locked rotor current. The 51LR trips if that current lasts longer than the set time, always below the motor’s safe stall time. Because it is enabled only after the start, it can be much faster than the 49.

Starts limit (66). Each start leaves heat in the rotor. The 66 counts starts in a time window, or uses the thermal capacity calculated by the 49 model, and blocks a new start until the motor cools down. It is the most frequent reason for “the motor won’t let me start it” after several attempts.

Locked rotor versus normal start
  • Is the starting time shorter than the safe locked rotor time?
    • Yes48 or 51LR on current and time are enough
    • NoIs a speed signal available?
      • YesA zero-speed switch (14) or speed sensor confirms that the rotor turns
      • NoReview the starting method or the thermal curve with the motor manufacturer

Setting criteria

Settings are never copied from another motor. They depend on:

  • The motor thermal limit curve and the cold and hot safe stall times (IEEE 620 describes how these curves are presented).
  • The actual starting time, taken from the motor starting study or from the relay’s start records, at the lowest expected voltage.
  • The starting method: a soft starter or an autotransformer starter lengthens the start and changes the shape of the current.
  • The number of starts the process needs and the number the manufacturer allows.
  • Coordination with thermal overload 49, 50/51 overcurrent and the upstream fuse or breaker.

The basic rule is that the trip must come before the safe locked rotor time and after the normal starting time, with margin for low voltage.

How each manufacturer implements it

These functions exist in every motor relay, but each brand organizes them its own way:

  • ABB (Relion 615 and 630) groups start supervision with the start counter and keeps jam protection separate.
  • SEL, GE Multilin, Siemens SIPROTEC and Schneider (MiCOM, Easergy) have prolonged start, locked rotor or jam, and starts limit elements, with different names, enabling logic and reset criteria, and some accept a speed switch input.

In practice, the same protection criterion becomes different settings and logic depending on the model and its software. That is where mistakes appear: a jam element enabled during the start, a prolonged start timer that does not see the soft starter ramp, or a start counter that does not match what the motor allows.

Why it trips or blocks

  • Start longer than the setting: low voltage, more load or inertia, soft starter ramp.
  • Copied setting from another motor, or from the data sheet of a motor of a different rating.
  • Real jam of the mechanical load, or damaged bearings.
  • Repeated starts that use up the thermal capacity: the 66 is right to block.
  • Poorly defined start detection: the relay does not see the contactor close, or the current threshold is wrong.
  • Undersized CTs that saturate with the starting current.

If the motor tripped and the cause is not clear, the relay’s start report, oscillography and event list will explain it. We analyze it in our relay trip analysis.

How it is tested

Secondary injection simulates a normal start and a prolonged one, a rotor that jams while running and a series of successive starts, and checks that each function operates within its time and that the enabling logic and restart blocking behave as designed. At commissioning, the first real start is compared with the setting.

Motor relay configuration

Did your motor trip on prolonged start or locked rotor with no apparent fault? Our team reviews the relay events and settings remotely, compares them with the thermal curve and the actual starting time, and loads the corrected settings. Tell us the brand and model through remote relay configuration or write to us on the contact page.

References

  • IEEE C37.2, IEEE Standard for Electrical Power System Device Function Numbers, Acronyms, and Contact Designations.
  • IEEE C37.96, IEEE Guide for AC Motor Protection.
  • IEEE 620, IEEE Guide for the Presentation of Thermal Limit Curves for Squirrel Cage Induction Machines.
  • ABB, REM630 Motor Protection and Control, application manual.

Frequently asked questions

What is the difference between 48 and 51LR?

Device 48 supervises the starting sequence: if the motor does not finish starting within the expected time, it trips. 51LR is used for a locked rotor or a jam: sustained high current, during the start or with the motor already running. Many relays combine them in a single start supervision function, and where one ends and the other begins depends on the manufacturer.

Why did the prolonged start protection trip if the motor has no fault?

Usually the actual start is longer than the setting: low voltage during the start, more mechanical load or more inertia than assumed, or a soft starter with a long ramp. It can also be a setting copied from another motor. The relay's motor start report (current and time) shows which one it was.

What if the starting time is longer than the safe locked rotor time?

It happens with high-inertia loads. Current alone cannot tell a rotor that is accelerating from one that is stalled, so a zero-speed switch (device 14) or the relay's speed detection is used: if the rotor is not turning when the safe time runs out, the relay trips; if it is turning, the start continues.

WhatsApp