Tiza Group

Home / Guides / Protection, control and communications / Protection functions

Protection functions

Protection, control and communications

ANSI 21Distance protection 21 (PDIS): how it worksWhat distance protection 21 is, how it measures impedance, how its zones are set and why it trips or blocks in the field.ANSI 51Overcurrent 50/51 and 50N/51N (PTOC, PIOC): How It WorksPhase overcurrent 50/51 and ground overcurrent 50N/51N: IEC and IEEE curves, setting criteria, false trips and testing. We can configure it remotely.ANSI 81Frequency protection 81U/81O: how it worksWhat frequency protection 81 (underfrequency 81U and overfrequency 81O) is, how it is used for load shedding and generators, settings and why it trips.ANSI 64Ground detector relay 64: what it is and its variantsWhat the 64 ground detector relay is: 64G and 64S for the stator, 64F and 64R for the rotor, 64B on ungrounded systems, 64 on DC systems and REF detection.ANSI 40Loss of Field Protection 40: Generator Excitation LossLoss of field (loss of excitation) protection, ANSI 40, for generators: principle, mho and admittance characteristics, settings, misoperations, testing.ANSI 47Phase Sequence Protection 47: How It WorksPhase sequence relay (ANSI 47): reverse rotation and negative-sequence voltage V2 in motors and generators, settings and trips. We can set it remotely.ANSI 50BFBreaker failure protection 50BF (RBRF): how it worksBreaker failure protection (ANSI 50BF, RBRF): logic, retrip, timer, setting criteria per IEEE C37.119, misoperations and testing. We configure it remotely.ANSI 87BBus Differential Protection 87B (PDIF): How It WorksBus differential protection 87B explained: high and low impedance schemes, check zone, disconnector replica and why a busbar protection trips or blocks.ANSI 49Thermal Overload Protection 49 (PTTR): How It WorksThermal overload relay (ANSI 49, PTTR): thermal model, why not every overload should trip, 49 versus 51, settings and why it trips. We set it remotely.ANSI 79Automatic Reclosing 79 (RREC): How It WorksAutomatic reclosing 79 explained: dead time, reclaim time, single-pole and three-pole reclosing, setting criteria and why a recloser does not reclose.

Other topics in this section

WhatsApp