Home / Guides / Protection, control and communications / Fundamentals and coordination
Fundamentals and coordination
Protection, control and communications
Protective Relays: Types, ANSI Functions and TestingWhat a protective relay is, its most common ANSI functions (50/51, 21, 87, 67), how it fits in the substation and how it is tested. We set them remotely.Zero-Sequence Current: What It Is and How Relays Use ItWhat zero-sequence current (3I0) is, when it flows, how transformers and grounding affect it, and which protection functions use it (50N/51N, 67N, REF).Fundamentals of Protective Relaying in SubstationsWhat a protection system is: components, reliability (dependability and security), properties and most commonly used ANSI/IEEE C37.2 device functions.Protection Coordination and Setting CriteriaWhat protection coordination is, selectivity methods, setting criteria for 50/51, 21 and 87 relays, and why settings must be reviewed. We do the study.Protection Zones, Primary and Backup ProtectionHow protection zones are set by the CTs, why they overlap at the breaker, internal vs external faults, and local vs remote backup protection schemes.MTMV Incomer Relay: Functions the Utility RequiresWhat a plant's medium-voltage incomer relay does, which functions the utility requires, and the CTs, VTs and auxiliary supply. We configure remotely.BT/MTMotor Protection Relay: Functions and How to ChooseMotor protection relay: its thermal model (49) and the functions each motor needs. How to choose one: CTs, RTDs, starter and communications in practice.BT/MT/ATCapacitor Bank Protection: What Covers WhatWhat threatens a capacitor bank and which protection covers it: unbalance, overcurrent, overvoltage, discharge before re-energizing and resonance.ANSI 50/51Transformer Feeder Relay: Self-Powered or AuxiliaryThe transformer feeder relay in an RMU or solar station: 50/51 and 50N/51N functions, auxiliary or self-powered supply, tripping and selection criteria.MT/AT/EATIEEE C37.99: Shunt Capacitor Bank Protection GuideWhat IEEE C37.99-2012 covers for shunt capacitor banks at substations, its structure and which threat each protection addresses. Remote setup is available.