Home / Guides / Protection, control and communications / Schemes and teleprotection
Schemes and teleprotection
Protection, control and communications
BT/MT/AT/EATSubstation Protection Systems: Schemes by ElementHow protection is combined for lines, transformers, buses, generators and feeders, and what changes between high, medium and low voltage power systems.MT/ATUnderfrequency Load Shedding (UFLS): How It WorksWhat underfrequency load shedding is, how it is built in stages with 81 and df/dt elements and why a scheme fails. We configure it remotely in detail.ANSI 85Direct Transfer Trip (DTT): Breaker Failure and ReactorsWhat direct transfer trip (DTT or intertrip) is, when it is used for breaker failure, reactors, transformers and anti-islanding, and what channel it needs.BT/MT/AT/EATGenerator protection scheme: zones, backup and trip modesHow the protections of a synchronous generator are combined in practice: internal faults, abnormal operating conditions, system backup and trip modes.MT/AT/EATDead zone and stub protection: faults between zonesDead zone between breaker and CT, stub protection in breaker-and-a-half, how these faults are detected and why logic can fail. We configure it remotely.ANSI 85Teleprotection Schemes (85): Types and Channel SolutionsTeleprotection channel solutions for lines: DUTT, PUTT, POTT, DCB, DCUB, DTT and phase comparison, what each one sends and the channel each one requires.ANSI 85Zone acceleration in distance protection: how it worksZone acceleration: the remote end's signal extends zone 1 or bypasses the zone 2 delay. Variants with and without a channel, misoperations and testing.MTRadial Feeder Protection: Recloser and Fuse CoordinationHow radial feeder protection is coordinated: substation breaker relay, recloser, sectionalizer and fuses, fuse saving, and why the scheme misoperates.AT/EATSingle-pole and three-pole reclosing: secondary arcSingle-pole and three-pole reclosing on transmission lines: secondary arc, dead time, pole discordance and leader-follower logic. We configure remotely.MTReverse Interlocking Busbar Protection in MVReverse interlocking (blocking) busbar protection in medium-voltage switchgear: how it works, setting criteria, GOOSE signals and why it misoperates.