Home / Guides / Protection, control and communications / Reclosers
Reclosers
Protection, control and communications
ANSI 79Entec EVR Recloser with ETR300-R or EVRC2A-NT ControlEntec EVR-1, EVR-2 and EVR-3 SF6 reclosers with ETR300-R and EVRC2A-NT controls: ratings, ANSI functions, DNP3 and IEC 61850. We configure them remotely.ANSI 79NOJA CMS, DCM and WSOS5 Recloser SoftwareRecloser software: NOJA CMS and Device Configuration Manager, Schneider WSOS5 for ADVC and Eaton ProView for Form 6: what each one does and when to use it.ANSI 79NOJA OSM Recloser and RC-10, RC-15, RC-20 ControlsNOJA OSM15-310, OSM27-310 and OSM38 reclosers with RC-10, RC-15, RC-20 controls: protection, reclosing, DNP3, IEC 61850. We can configure them remotely.ANSI 79ABB OVR-3 and GridShield Recloser, PCD and RER620ABB OVR-3, OVR-3SP, OVR-1 and GridShield reclosers with PCD, ICD, RER615 and RER620 controls: what they are, variants, functions, IEC 61850 and PCM600.ANSI 79SEL-651R, SEL-651RA and SEL-351R Recloser ControlsSEL-651R (SEL-651R-2), SEL-651RA and SEL-351R recloser controls: compatible reclosers, functions, IEC 61850, DNP3 and QuickSet software in practice.ANSI 79Eaton NOVA Recloser and Form 4C, 5, 6 ControlsEaton (Cooper Power series) NOVA 15, 27, 38 and NOVA-TS reclosers with Form 4C, Form 5 and Form 6 controls: compatibility, functions and ProView settings.ANSI 79Tavrida Rec15, Rec25, OSM Recloser and RC5 ControlTavrida Electric Rec15, Rec25 and 38 kV recloser: OSM module, RC5 control cabinet, protection functions, DNP3, IEC 60870-5-104 and TELARM. We configure it.ANSI 79Schneider U27, N38, W27 Reclosers and ADVC3 ControlSchneider U27, N38 and W-Series reclosers with ADVC2, ADVC Ultra, Compact and ADVC3 controls. Variants and communications. We configure it remotely.ANSI 79Arteche smART RC Recloser, SDR-TS and Ingeteam DAArteche smART RC recloser up to 36 kV with the smART P500-RC relay, SDR-TS, Ingeteam INGEPAC DA and Hubbell Elastimold controls. We can run the study.ANSI 79ZW32-12 Recloser: Chint, Ghorit, Rockwill and FTUZW32-12 pole-mounted reclosers from Chint, Ghorit and Rockwill with an FTU controller: variants, published ratings, protection and communications setup.