Tiza Group

Home / Guides / Protection, control and communications / Control, SCADA and interlocking

Control, SCADA and interlocking

Protection, control and communications

Interlocking: What It Is, Mechanical and Electrical TypesWhat an interlock is and how mechanical and electrical interlocking work on disconnectors, earthing switches, breakers and switchgear. We set it up.Substation Interlocking: Bay Logic and LevelsHow interlocking is organized in a substation: what is interlocked in each bay, at which level each condition is solved and how IEC 61850 expresses it.AT/EATRedundant gateway and dual links to the control centerHow the control center link is made redundant: hot or standby gateways, IEC 60870-5-104 redundancy groups, two control centers and separate physical paths.MT, AT, EATPoint-to-point signal testing: SAS and SCADAPoint-to-point signal testing in a substation automation system (SAS): from the terminal to the IED, SCADA and control center, with quality and time stamp.Substation RTU and Gateway: Functions, ProtocolsWhat a substation RTU and gateway are: IEC 60870-5-104, DNP3 and IEC 61850 protocols, time sync, cybersecurity, testing and common faults.BTLow-voltage breaker and tie interlockingMechanical and electrical interlocking of low-voltage breakers: cable or rod, 2-of-3, utility-generator and undervoltage release. We do the wiring design.MT/AT/EATSubstation SCADA and HMI: What They Do and How Control WorksWhat a substation SCADA and HMI do in practice: one-line mimic, alarms, event lists, select-before-operate control, local and remote levels and historian.Bay Controller (BCU): Parts, Functions, TestingWhat a bay controller is, what it does (control, interlocking, synchrocheck, metering), how it fits into IEC 61850 and how it is tested in practice.MT/BTKirk and Castell trapped key interlocking: how it worksTrapped key interlocking (Kirk, Castell): how it works, typical switchgear and low-voltage transfer sequences, and its limits. We can design it for you.BT/MT/AT/EATInterlocking at EHV, HV, MV and LV: what changesHow interlocking changes with voltage level: logic in BCUs and GOOSE at HV and EHV, mechanical in MV switchgear, cable or key in LV. We configure remotely.

Other topics in this section

WhatsApp