Networks and clocks
Protection, control and communications
MT/AT/EATSubstation network topologies: star, ring, ladderStar, dual star, ring, ring of rings and ladder in a substation network: availability, cost, hop count, redundancy and what happens when one switch fails.MT/AT/EATSubstation network redundancy: RSTP, PRP, HSR or MRPHow to choose substation network redundancy: RSTP, MRP, PRP or HSR, recovery time, cost, SAN, DAN and RedBox nodes, and what each function requires.AT/MTSubstation Time Synchronization: GNSS, IRIG-B and PTPHow time is synchronized in a substation: GNSS clocks, IRIG-B, SNTP and PTP (IEC/IEEE 61850-9-3), with accuracy classes for events and sampled values.MT/AT/EATSubstation Communications Network: Levels and ProtocolsCommunications network of an IEC 61850 substation: levels, station and process bus, which protocol goes where, timing, redundancy and cybersecurity.AT/EATOPGW and ADSS Cable: Fiber on Transmission LinesWhat OPGW cable is and how it differs from ADSS, how the line fiber reaches the substation, IEEE 1138, IEEE 1222 and IEC 60794-4, and typical failures.AT/EATTeleprotection over IP/MPLS Networks: What ChangesWhat changes in teleprotection when moving from SDH to an MPLS network: latency, delay variation, asymmetry, MPLS-TP versus IP/MPLS and circuit emulation.AT/EATRedundant Teleprotection Channels: Routes and DiversityWhy EHV lines duplicate the teleprotection channel, what route and media diversity mean, and how the two channels are combined in each protection scheme.AT/EATMultiplexers and Fiber Networks: OPGW, SDH and MPLS-TPHow fiber networks link substations: OPGW and ADSS cable, SDH and MPLS-TP multiplexers, C37.94 and G.703 interfaces, and 87L latency and asymmetry effects.MT/AT/EATSubstation communications by voltage level: MV, HV, EHVSubstation communications at medium, high and extra-high voltage: protocols, topology, redundancy, time sync and teleprotection, and what changes by level.AT/MTSubstation Ethernet Switch: IEC 61850-3, VLAN, RedundancyWhat a substation switch needs: IEC 61850-3 and IEEE 1613, IEEE 802.1Q VLANs, GOOSE and SV filtering, RSTP vs PRP and HSR, port security and remote setup.