Home / Guides / Protection, control and communications / Devices by model
Devices by model
Protection, control and communications
MT/AT/EATSchneider ION9000, ION8650 and ION7650 MetersSchneider ION9000, ION9000T, ION8650, ION8800, ION7650 and ION7550 meters: variants, Class 0.1S, power quality, DNP3, IEC 61850 and migration paths.MT/ATSEL RTAC: SEL-3530, SEL-3530-4, SEL-3555 and SEL-3505What the SEL RTAC is (SEL-3530, 3530-4, 3555, 3505 and SEL-3350), how it works as gateway and controller, with its protocols. We can configure it remotely.MT/ATSIPROTEC 6MD85, 6MD86 and 6MD6 Bay ControllersSiemens SIPROTEC 6MD85 and 6MD86 bay controllers, and the SIPROTEC 4 6MD61, 6MD63 and 6MD66: functions, IEC 61850 and DIGSI 5. Remote setup offered.MT/ATABB REC670, REC650 and REC615 Bay ControllersREC670 and REC650 bay controllers (Hitachi Energy, formerly ABB) and the ABB REC615 recloser controller: variants, functions, IEC 61850 and PCM600 tools.BT/MTiFIX and CIMPLICITY SCADA from Proficy (Formerly GE)iFIX and CIMPLICITY, Proficy's HMI/SCADA software (formerly GE): what each is, where it is used and how it integrates with the electrical power system.AT/EATJungleMUX SONET Multiplexer: FOX615, FOX515 and TN1UUtility multiplexers Hitachi Energy FOX615 and FOX515, GE Lentronics JungleMUX and TN1U: SDH, SONET, MPLS-TP and teleprotection channels for utilities.MT/AT/EATPRP/HSR RedBox: RUGGEDCOM RS950G, X204RNA, Moxa PT-G503PRP and HSR RedBox in substations: Siemens RUGGEDCOM RS950G, SCALANCE X204RNA, Moxa PT-G503-PHR-PTP and Hirschmann RSP. What it is and when it is used.MT/AT/EATCOPA-DATA zenon Energy Edition SCADA: What It IsCOPA-DATA zenon and zenon Energy Edition for substations: Engineering Studio, Service Engine, IEC 61850, IEC 60870-5-104 and DNP3, and where it is used.BT/MTSchneider PowerLogic PM8000, PM5000 and PM2000 MetersSchneider PM5560, PM5330, PM5110, PM8240 and PM8340 meters: PowerLogic PM2000, PM5000 and PM8000 variants, accuracy classes, Modbus, IEC 61850, SCADA.MT/AT/EATHitachi Energy MicroSCADA X SYS600 and DMS600 SCADAMicroSCADA X SYS600 and DMS600 from Hitachi Energy (formerly ABB MicroSCADA Pro): substation SCADA, distribution management, IEC 61850 and fault location.