Tiza Group

Home / Guides / Protection, control and communications

SIPROTEC 6MD85, 6MD86 and 6MD6 Bay Controllers

Siemens SIPROTEC 6MD85 and 6MD86 bay controllers, and the SIPROTEC 4 6MD61, 6MD63 and 6MD66: variants, functions, IEC 61850 and DIGSI 5.

By Shadai García, CEO and protection engineer at Tiza Group.

control centerIEC 104HMIstation networkgatewayBCUcontrollerLR43bus8952linein service: selector in remotethe operator selects 52the controller checks interlocksselection acceptedoperate: the controller opens 52position returns to HMI and centreselector in local at the bayremote selection rejectedselector in remote: close with SBO52 closed and confirmedHMIcontrollercircuit breakerselectacceptedoperateopen 52positionselector in localselectrejectedSBOclose 52select-before-operate (SBO) control, IEC 61850IEC 61850IHMICSWICILOXCBR© tizagrp.comcontrol centerIEC 104HMIstation networkgatewayBCUcontrollerLR43bus8952linein service: selector in remotethe operator selects 52the controller checks interlocksselection acceptedoperate: the controller opens 52position returns to HMI and centreselector in local at the bayremote selection rejectedselector in remote: close with SBO52 closed and confirmedHMIcontrollercircuit breakerselectacceptedoperateopen 52positionselector in localselectrejectedSBOclose 52select-before-operate (SBO) control, IEC 61850IEC 61850IHMICSWICILOXCBR© tizagrp.com
Substation SCADA and HMI: select-before-operate control, interlocking and local/remote selector. Location in the system, operating principle and IEC 61850. Illustrative: actual values come from the nameplate and the manufacturer's manual.
Short answer

The SIPROTEC 6MD85 and 6MD86 are Siemens' modular bay controllers on the SIPROTEC 5 platform, for medium-voltage switchgear and high and extra-high voltage yards. They control and interlock breakers and disconnectors, check synchronism, measure, record faults, can act as a PMU and carry protection functions from the SIPROTEC library. They are configured with DIGSI 5 and integrated over IEC 61850. The 6MD61, 6MD63 and 6MD66 are the SIPROTEC 4 generation.

What it is and where it is used

The Siemens SIPROTEC 6MD85 and 6MD86 are the bay control units (BCUs) of the SIPROTEC 5 platform. Siemens presents them as modular controllers for medium-voltage switchgear and for high and extra-high voltage yards, with integrated operation and protection functions. In older substations the 6MD61, 6MD63 and 6MD66 are found, from the SIPROTEC 4 generation.

A bay controller is the device that handles the breakers and disconnectors of a bay: it receives their positions, executes the open and close commands from the operator or SCADA, applies the interlocking and checks synchronism before closing. In many transmission substations the controller is separate from the protective relays; in others, a single IED does both. For the general concept, see the guide on bay controller.

Variants: 6MD85, 6MD86 and 6MD6x

ModelApplicationMain difference
SIPROTEC 6MD85Medium to high voltage baysFive standard variants; 4 current and 4 voltage inputs, 11 to 75 binary inputs and 9 to 41 binary outputs
SIPROTEC 6MD86Medium to extra-high voltage baysSeven standard variants; 4 or 8 measurement inputs; controlled switching and per-phase control
SIPROTEC 4 6MD61 / 6MD63 / 6MD66Existing baysPrevious generation, configured with DIGSI 4

Both SIPROTEC 5 models are expanded with input and output modules of the same platform, so a standard variant grows according to the needs of the bay.

Main functions

According to Siemens’ public information, the 6MD8 devices provide:

FunctionANSIWhat it adds to the bay
Switching device control with select-before-operate—Safe opening and closing from the HMI, SCADA or control center
Bay and substation interlocking—Prevents improper operations; DIGSI 5 templates for typical cases (GOOSE interlocking)
Synchronism check25Allows the breaker to close only with compatible voltages (guide)
Automatic voltage control90Transformer tap changer regulation
Phasor measurement unit (PMU)—Synchrophasors according to IEEE C37.118
Fault recording—Oscillography to analyze bay events

Siemens also mentions control of arc-suppression (Petersen) coils, test functions and, in the 6MD86, controlled switching (point-on-wave) and per-phase breaker control. Additional protection functions come from the SIPROTEC 5 library and depend on what is ordered.

Communications and IEC 61850

Configuration is done with DIGSI 5, with application templates for standard bays, interlocking and extended control, and a graphical logic editor. Network redundancy and additional protocols (for example PRP and HSR or IEC 60870-5-104) depend on the installed module; see Siemens DIGSI software.

More data from the 6MD86 technical profile

The 6MD86 profile that Siemens publishes (2020 edition) adds data that is useful for specifying:

  • Hardware. Housing width from 1/3 to 2/1 of 19 inches. When the number of inputs and outputs requires it, the device is expanded with a second row; the profile cites more than 240 binary inputs with the IO230 module as an example. The boards come with a conformal coating as standard for harsh environments.
  • Protocols per module. Besides IEC 61850-8-1 and 9-2 client, the plug-in modules can carry IEC 60870-5-103, IEC 60870-5-104, Modbus TCP, DNP3 serial and TCP, and PROFINET IO, including PROFINET IO S2 redundancy. The fixed RJ45 Ethernet port is used for DIGSI 5 and for IEC 61850 (reports and GOOSE).
  • Network. Virtual network partitioning with VLANs per IEEE 802.1Q, and reliable transmission through the PRP and HSR redundancy protocols.
  • Cybersecurity. Role-based access control, security event logging, signed firmware and network access authenticated with IEEE 802.1X; Siemens states that it meets the requirements of NERC CIP and of the BDEW white paper.
  • Basic power quality. Voltage unbalance, voltage variations (swell, sag, interruption), total harmonic and demand distortion (THD and TDD) and harmonics.
  • Fault recording. Memory for a maximum recording time of 80 s at 8 kHz or 320 s at 2 kHz.
  • Browser access. Web pages of the device with information, diagnostics, phasor diagrams and the single-line diagram, without installing DIGSI.
  • Applications. Besides control, the profile proposes it as selective protection of overhead lines and cables fed from one or several ends when protection communication is used, with protection-class current transformers, and in substations with a breaker-and-a-half layout. Overcurrent can be configured as an emergency function.

The number of standard variants depends on the Siemens document: the 2020 profile lists six variants for the 6MD86, while the current product page lists seven. When specifying, use the manufacturer’s current ordering list, not a figure from an old document.

Points of attention in engineering and commissioning

  • Which signals are assigned to each module. The communication modules are a limited resource (up to four): if the project needs IEC 61850, a protocol to the control center, redundancy and PROFINET, the assignment is defined when the device is ordered.
  • Control with interlocks between bays. If the logic depends on GOOSE from other bays, the behavior on a lost message or invalid quality is decided in the design and tested. The modes described in test blocks and bay isolation are tested as well.
  • Synchronism. The check 25 requires that the voltages on both sides reach the device and that the phase references are well defined; in bays with a transformer, the vector group phase shift must be compensated.
  • DIGSI 5 and firmware version. Compatibility between the two is verified before opening an existing project, using the manufacturer’s documentation for that version.
  • Document the data model. The SCL file exported from the device is the one used by SCADA or the gateway; see IEC 61850 SCL files.

Frequently asked technical questions

  • 6MD85 or 6MD86 manual: Siemens publishes them by SIPROTEC 5 version; DIGSI 5 must be compatible with the device firmware.
  • The close command does not execute: it is usually an interlock that is not met, a synchronism condition or a disconnector position read incorrectly (inconsistent double-point contacts).
  • Interlocks between bays by GOOSE: if a message does not arrive or arrives with invalid quality, the interlock blocks; see GOOSE does not arrive or arrives late.
  • Replacing a 6MD63 or 6MD66 with a 6MD85: it is not a configuration copy; the platform, the tool (DIGSI 4 to DIGSI 5), the inputs and outputs and the IEC 61850 model all change.

If your device is no longer manufactured

The 6MD61, 6MD63 and 6MD66 belong to SIPROTEC 4, the generation before SIPROTEC 5. Moving to a 6MD85 or 6MD86 means redoing the interlocking logic, the input and output mapping and the SCADA integration. We design the replacement, configure the new device and test it before energizing; see engineering design and studies.

How we can help

Our team configures SIPROTEC bay controllers: control logic and interlocking, synchronism check, IEC 61850 integration with SCADA and the gateway, and functional tests of the bay. We load and modify logic, interlocks and signals remotely, worldwide, through remote configuration of SIPROTEC relays and controllers, without waiting for a site visit. See control, protection and communications configuration and, for the communications part, IEC 61850 engineering. To request a quotation, write to us through contact.

References

  • Siemens, SIPROTEC 6MD85 and SIPROTEC 6MD86 product pages.
  • IEC 61850 (series), communication networks and systems for power utility automation.
  • IEEE C37.118.1, synchrophasors.
  • IEEE C37.2, standard for electrical power system device function numbers.

Frequently asked questions

What is the Siemens 6MD85?

It is the modular bay controller of Siemens' SIPROTEC 5 platform. It controls and monitors the switching devices of a bay, with interlocking, synchronism check, measurement and fault recording, and it can include protection functions. Siemens offers it in standard variants with 4 current inputs, 4 voltage inputs and between 11 and 75 binary inputs.

What is the difference between the 6MD85 and the 6MD86?

Both are SIPROTEC 5 bay controllers. According to Siemens, the 6MD86 has more standard variants, supports 4 or 8 current and voltage measurement inputs and adds functions such as controlled switching (point-on-wave) and per-phase breaker control. Which one is used depends on the bay configuration and on what the engineering requires.

Where can I find the 6MD85 manual?

Siemens publishes the SIPROTEC 5 manuals by firmware version, together with the DIGSI 5 application templates. The manual for one version may not match the installed device, so check the firmware version first.

WhatsApp