Home / Tools
Tools for the protection engineer
The look-ups and calculations we do every day in substations and industrial plants, ready to use on a phone or a desktop. They are free and everything is calculated in your browser: no data is sent anywhere.
Protection
Settings, instrument transformers and protection functions.
Analysis and communications
Fault records, sequence components and IEC 61850 networks.
Equipment testing and diagnostics
Correction and interpretation of test results on transformers, motors and bushings.
Studies and industry
Short circuit, power quality, cables, batteries and grounding.
These tools are for estimates and quick reference. Protection settings and electrical studies are done with the full system model and the equipment documentation.
Need the settings loaded into the relay?
We configure relays and recloser controls of the main brands remotely: protection, control and communications. Tell us the make and model and we confirm availability.