Tiza Group

Home / Tools / DGA interpretation

Dissolved gas analysis (DGA) interpretation

Enter the lab result for a mineral-oil transformer: the dashboard gives you the IEEE C57.104-2019 DGA status, the probable fault type on the Duval triangles and from the IEC 60599 ratios, and warns you if the gases rose more than normal since the previous sample.

IEEE C57.104-2019§ 6.1.3DGA status, Tables 1 to 4IEEE C57.104-2019§ 6.2.3Duval triangle 1IEEE C57.104-2019§ D.4Duval triangles 4 and 5IEC 60599:2022§ 5.4basic gas ratios

Example cases
Dissolved gas analysis (DGA) interpretation
E1Current sample
ppm
ppm
ppm
ppm
ppm
ppm
ppm
E2Transformer and reading
ppm
ppm

O2/N2 and age select the section of the IEEE C57.104 tables. O2 and N2 are optional: without them the O2/N2 > 0.2 section is used.

E3Previous sample
d
ppm
ppm
ppm
ppm
ppm
ppm
ppm

Use a decimal point. The calculation runs in your browser and updates as you type.

Probable fault, Duval 1

—

DGA status, IEEE C57.104

—

IEC 60599 ratios

—

Duval 4 or 5

—

Change from the previous sample

—

CO2/CO

—

Duval triangle 1
  • Current sample
  • Previous sample
Each vertex is 100 % of its gas; the coordinates are the percentages of CH4, C2H4 and C2H2 over their sum. Zones from Table 6 of IEEE C57.104-2019.
Complementary triangle
  • Current sample
Triangle 4 (H2, CH4, C2H6) refines PD, T1 and T2; triangle 5 (CH4, C2H4, C2H6) refines T2 and T3. Neither is used after D1 or D2.
Each gas against the IEEE C57.104 values
  • Above Table 2
  • Between Tables 1 and 2
  • Below Table 1
  • Table 1 (×1) and Table 2
Logarithmic scale in multiples of the Table 1 value (90th percentile) for the chosen O2/N2 ratio and age. The short yellow mark on each row is its Table 2 value (95th percentile).

Step-by-step calculation

What it means for your transformer

    What it is for

    Dissolved gas analysis (DGA) is the test that gives the earliest warning of an internal fault in an oil-filled transformer: a hot spot, a loose connection, partial discharges or an arc leave their gas signature long before a protective relay operates. The lab report gives seven or eight concentrations in ppm, and reading it properly means cross-checking several tables and methods. This tool does that cross-check with the IEEE C57.104-2019 guide and with IEC 60599, so you know whether the result calls for a confirmation sample, closer monitoring or electrical tests, and which type of fault is the most likely.

    How it is calculated

    IEEE C57.104-2019§ 6.1.3Tables 1 to 4

    DGA status

    Status 3 if any gas > Table 2 · Status 2 if any gas > Table 1 · Status 1 otherwise

    Tables 1 and 2 are the 90th and 95th percentiles of a large database of lab results, split by the O2/N2 ratio (≤ 0.2 or > 0.2) and the transformer age. Without O2/N2 the > 0.2 section is used, as step 3 of the procedure states. With a previous sample, each increase Δ = Ccurrent − Cprevious is compared with Table 3 (for acetylene, any increase): if it exceeds it, the guide calls for a confirmation sample before changing the status (step 4b). An ethylene increase of 200 ppm or ethane of 1000 ppm is treated as an extreme result (6.1.2.4).

    IEEE C57.104-2019Table 4, rates from 3 to 6 samples

    Rate = Δ · 365 / days [ppm/year]

    Table 4 was derived by linear regression over 3 to 6 samples in 4 to 24 months. With two samples the rate is only indicative: the tool compares it with Table 4 when the interval falls in 4–9 or 10–24 months, but does not raise the status because of it.

    IEEE C57.104-2019§ 6.2.3Table 6IEEE C57.104-2019§ D.4Tables D.3 and D.4

    Duval triangles

    %CH4 = 100 · CH4 / (CH4 + C2H4 + C2H2) · likewise for C2H4 and C2H2

    The three percentages place the point on triangle 1 and the zone comes from the limits of Table 6: PD with CH4 ≥ 98 %; T1, T2 and T3 with C2H2 < 4 % (15 % for T3) and C2H4 below 20 %, between 20 and 50 % or above 50 %; D1 with C2H4 < 23 % and C2H2 ≥ 13 %; D2 and DT elsewhere. Triangle 4 uses H2, CH4 and C2H6 and triangle 5 uses CH4, C2H4 and C2H6, with zones S (stray gassing), O (overheating < 250 °C), C (possible paper carbonization), T2, T3 and ND (not defined). In two rows of Tables D.3 and D.4 the printed text does not match Figures D.3 and D.4 and leaves zones unassigned; the tool follows the figures, and the tests check it point by point.

    IEC 60599:2022§ 5.4Table 1, ratio interpretation

    R1 = C2H2/C2H4 · R2 = CH4/H2 · R3 = C2H4/C2H6
    • PD: R2 < 0.1 and R3 < 0.2 (R1 not significant).
    • D1: R1 > 1; R2 from 0.1 to 0.5; R3 > 1. D2: R1 from 0.6 to 2.5; R2 from 0.1 to 1; R3 > 2.
    • T1: R3 < 1 (R1 and R2 not significant). T2: R1 < 0.1; R2 > 1; R3 from 1 to 4. T3: R1 < 0.2; R2 > 1; R3 > 4.

    IEC 60599 no longer uses the 0, 1 and 2 codes of the old IEC 599: it compares the ratios with these ranges. A combination that falls in no row has no diagnosis, and D1 and D2 overlap when R1 is between 1 and 2.5. A gas absent from both numerator and denominator (0/0) is taken as a zero ratio.

    IEEE C57.104-2019§ D.8CO y CO2IEC 60599:2022§ 5.5CO2/CO ratio

    CO2/CO < 3 with CO > 1000 ppm · CO2/CO > 20 with CO2 > 10,000 ppm

    High CO with a low ratio only points to the paper if there are also significant hydrocarbons; without them it is usually oil oxidation with little oxygen. High CO2 with a high ratio indicates slow paper aging, which is confirmed with furans.

    Limits of the calculation

    • It is an indicative interpretation, not a diagnosis. The values in the IEEE tables are statistical: the guide itself warns that they are not universal limits and that each transformer owner should derive its own from its history.
    • It applies to mineral-oil power transformers. It does not apply to natural or synthetic esters (IEEE C57.155), to the on-load tap changer compartment, or to instrument transformers or bushings.
    • With every gas below Table 1, IEEE C57.104 does not recommend identifying the fault: the point on the triangles is shown for reference only.
    • If the on-load tap changer leaks oil into the main tank, acetylene and ethylene can rise without a fault in the active part.
    • The triangles and the ratios always point to a zone, whether there is a fault or not. Confirm with a second sample taken in a syringe and with electrical tests before deciding on an intervention.

    Frequently asked questions

    How is the dissolved gas analysis of a transformer interpreted?

    In two steps. First, decide whether there is anything to investigate: IEEE C57.104-2019 compares each gas with its 90th and 95th percentile values for the O2/N2 ratio and the transformer age, and the increase from the previous sample, and assigns a DGA status from 1 to 3. Only if a gas exceeds those values is the fault type identified with Duval triangle 1 (and triangles 4 and 5 to refine thermal faults) or with the IEC 60599 ratios. With all gases low, the guide does not recommend a diagnosis.

    What does acetylene in transformer oil indicate?

    Acetylene (C2H2) forms in significant amounts near 1000 °C, in arcs and sparks or in very hot spots. A transformer without internal fuses, switches or other arcing parts should not produce it in normal service. That is why IEEE C57.104-2019 treats any increase of acetylene between two samples as a change to be confirmed and sets for it the lowest reference values of all the gases, from 1 to 7 ppm depending on the case.

    How is the Duval triangle used?

    Add up the methane, ethylene and acetylene concentrations and calculate the percentage of each over that sum. Those three percentages are the coordinates of a point on the triangle, which falls in one of seven zones: PD (partial discharges), D1 and D2 (low- and high-energy discharges), T1, T2 and T3 (thermal faults below 300 °C, between 300 and 700 °C and above 700 °C) and DT (mixed). If the result is PD, T1 or T2 it can be refined with triangle 4 (hydrogen, methane and ethane); if it is T2 or T3, with triangle 5 (methane, ethylene and ethane).

    We test your transformer when the oil gives a warning

    If DGA rises, electrical tests locate the fault: we measure turns ratio, winding resistance, insulation, %Z and tan δ on medium-voltage, high-voltage and extra-high-voltage transformers in substations and industry, in Colombia, or elsewhere on request.

    Other tools

    COMTRADE generatorCreate a COMTRADE fault record (.cfg/.dat or .cff) for your test set: fault, DC offset and breaker opening.ANSI / IEEE C37.2 device numbersDevice function numbers 1 to 94, common suffixes and their IEC 61850 logical node, with search.Relay coordinationUp to six relays, reclosers and fuses on a log-log plot, with the IEEE C57.109 damage curve, inrush and the coordination margin of each pair.Inverse-time curvesCalculator and log-log plot of the IEC 60255-151 and IEEE C37.112 curves, with the coordination margin.CT burdenLead resistance, relay burden and comparison with the rated burden of the current transformer.Short-circuit currentQuick estimate of the three-phase fault at the secondary of a transformer.COMTRADE viewerOpen .cfg/.dat or .cff fault records in your browser: waveforms, digital channels, cursor and RMS. The file is not uploaded.IEC 61850 SCL viewerOpen .scd, .cid or .icd files in your browser: IEDs, GOOSE and SV addresses, datasets, subscribers and checks. The file is not uploaded.GOOSE and SV addressesCheck IEC 61850 multicast MAC, APPID, VLAN and priority, find duplicates and export the table as CSV.Process bus networkSV and GOOSE bandwidth, worst-case latency, PRP, HSR or RSTP redundancy and PTP time error of an IEC 61850 network.Interlocking table and CILO equationsInterlocking matrix per device, IEC 61850 EnaOpn and EnaCls equations, GOOSE signals between bays and FAT/SAT test cases per configuration.Per-unit base conversionBase current and impedance, conversion between %, pu and ohms, and change of base for transformers, generators and lines.Harmonic distortion THD and TDDVoltage THD and current TDD against the IEEE 519-2022 limits, with the spectrum as a bar chart.Symmetrical componentsPhase quantities to zero, positive and negative sequence and back (Fortescue), with phasor diagrams and what they mean for 46, 67Q and 51N.Vector group compensation (87T)TAP of each winding, phase compensation matrix, zero-sequence removal and the HV-to-LV clock diagram.Primary and secondary impedance (21)Primary to secondary ohms with the CT and VT ratios, line Z1, Z0 and k0, and zone reaches on the R-X plane.CT saturationRequired versus available voltage (5P/10P, PX or C class), time to saturation and the saturated waveform.Insulation temperature correctionInsulation resistance at 40 °C (IEEE 43) or 20 °C, PI, DAR and power factor of transformers and bushings, with the trend.Capacitor bankkvar to correct the power factor, steps of the automatic bank, capacitance and resonance with the transformer.Cable voltage dropΔV and % with R and X per km, copper or aluminium, mm² or AWG/kcmil, and the short-circuit check of the cable size.Battery sizingAh, number of cells and charger of a DC battery bank from its duty cycle, per IEEE 485 and IEEE 1115.Grounding resistanceGround rods, horizontal conductor and grid (BS 7430, IEEE 80), and soil resistivity from Wenner measurements.Technical glossarySubstation, protection and communications terms, explained in one or two sentences.
    WhatsApp