MAC and APPID addresses for GOOSE and SV

Paste the list of GOOSE and sampled value control blocks of your IEC 61850 project. The tool checks multicast addresses, APPID, VLAN and priority, flags duplicates, suggests free values and gives the table back as CSV.

IEC 61850-8-1GOOSE: multicast MAC and APPIDIEC 61850-9-2sampled valuesIEEE 802.1QVLAN and priorityIEC/IEEE 61850-9-3PTP, power profile

Example cases
MAC and APPID addresses for GOOSE and SV
E1Control blocks

Columns: IED, control block, type, MAC, APPID, VLAN, priority. Separate with comma, semicolon or tab; you can paste from a spreadsheet. Type and priority are optional (the type comes from the fourth octet of the MAC). APPID in hexadecimal, with or without 0x. The list is not included in the copied link.

Plan status

—

Blocks checked

—

Errors

—

Warnings

—

Address map
  • Used once
  • Default value
Each cell is an address of the recommended range, starting from the first one your plan uses. Red: two or more blocks use it. Addresses outside the range do not appear here: they are flagged in the table.

Row-by-row review

IED / control blockTypeMACAPPIDVLAN · prio.Review

What it means for the substation network

    What it is for

    To check the address plan of a substation before loading the SCD into the IEDs and switches, or when a GOOSE stops arriving after a device is added. The most common faults it finds are a MAC copied from another block, an APPID left at its default value and a VLAN 0 that leaves the message unsegregated.

    How it is checked

    Each row is compared with the ranges of IEC 61850-8-1 (GOOSE, multicast address and APPID annex) and IEC 61850-9-2 (sampled values), with the IEEE 802.1Q tag and, for PTP, with IEEE 1588 (Ethernet transport annex) and IEC/IEEE 61850-9-3:

    MessageDestination MACEthertypeAPPIDDefault
    GOOSE01-0C-CD-01-00-00 to 01-0C-CD-01-01-FF0x88B80x0000 to 0x3FFFVID 0, priority 4
    Sampled values (SV)01-0C-CD-04-00-00 to 01-0C-CD-04-01-FF0x88BA0x4000 to 0x7FFFVID 0, priority 4
    GSSE (legacy, obsolete)01-0C-CD-02-…0x88B9——
    PTP (IEEE 1588, power profile)01-1B-19-00-00-00; peer delay: 01-80-C2-00-00-0E0x88F7—Per the profile

    IEC 61850-8-1GOOSE MAC and APPIDIEC 61850-9-2SV MAC and APPID

    • MAC: six hexadecimal octets; the first three 01-0C-CD and the fourth by type. Last two octets outside 00-00 to 01-FF are flagged as a warning (outside the recommended range).
    • APPID: within the range of the type; 0x0000 for GOOSE and 0x4000 for SV are flagged because they are used as the not-configured value. Some older 9-2LE implementations use 0x4000 on purpose.

    IEEE 802.1QVID and priorityIEC 61850-8-1default priority 4

    • VLAN: VID 0 to 4094; 4095 is reserved. 0 means a priority-tagged frame with no VLAN; 1 is the default VLAN of the switches.
    • Priority: 0 to 7. The IEC 61850-8-1 default is 4, and in practice trip GOOSE and sampled values go between 4 and 7; so a priority below 4 on GOOSE or SV is flagged as a warning (Tiza criterion).
    • Duplicates: the same MAC or APPID in two blocks, or the same block twice.
    • Suggestions: the next free MAC and APPID within the range of the type, starting at 01-0C-CD-01-00-01 / 0x0001 for GOOSE and 01-0C-CD-04-00-01 / 0x4001 for SV.

    The MAC and APPID ranges were taken from the cited standards as reproduced by relay and test-set manufacturers and the UCA users group; always confirm against the edition of the standard and the manual of your IEDs.

    Limits of the check

    • It does not read SCL files; it works with the table you paste.
    • It does not check the switch port and trunk configuration, multicast filtering, network load or the subscriptions of each IED.
    • Some manufacturers limit the APPID or VLAN range their devices accept.
    • It is a consistency check, not a network design.

    Frequently asked questions

    Which MAC address does a GOOSE message use?

    A multicast address from the block reserved for IEC 61850, which starts with 01-0C-CD. The fourth octet is 01 for GOOSE and 04 for sampled values, and the recommended range runs from 01-0C-CD-01-00-00 to 01-0C-CD-01-01-FF. Each control block should have its own address so the switches can filter it.

    Which APPID range is used for GOOSE and for sampled values?

    GOOSE uses 0x0000 to 0x3FFF and sampled values 0x4000 to 0x7FFF. 0x0000 for GOOSE and 0x4000 for SV are used as defaults (not configured), so give each publisher a unique APPID other than those.

    Can two GOOSE messages share a MAC address?

    Technically the subscriber tells them apart by other fields, but it is not recommended: the switch can no longer filter one without the other and every IED receives traffic it does not need. Good practice is one MAC address per control block and a VLAN other than zero.

    We configure your IEC 61850 system

    We design the address and VLAN plan, configure GOOSE, sampled values, PTP and gateways, and test each message on the substation network. Remotely worldwide, or on site in Colombia and elsewhere on request.

    Other tools

    COMTRADE generatorCreate a COMTRADE fault record (.cfg/.dat or .cff) for your test set: fault, DC offset and breaker opening.ANSI / IEEE C37.2 device numbersDevice function numbers 1 to 94, common suffixes and their IEC 61850 logical node, with search.Relay coordinationUp to six relays, reclosers and fuses on a log-log plot, with the IEEE C57.109 damage curve, inrush and the coordination margin of each pair.Inverse-time curvesCalculator and log-log plot of the IEC 60255-151 and IEEE C37.112 curves, with the coordination margin.CT burdenLead resistance, relay burden and comparison with the rated burden of the current transformer.Short-circuit currentQuick estimate of the three-phase fault at the secondary of a transformer.COMTRADE viewerOpen .cfg/.dat or .cff fault records in your browser: waveforms, digital channels, cursor and RMS. The file is not uploaded.IEC 61850 SCL viewerOpen .scd, .cid or .icd files in your browser: IEDs, GOOSE and SV addresses, datasets, subscribers and checks. The file is not uploaded.Process bus networkSV and GOOSE bandwidth, worst-case latency, PRP, HSR or RSTP redundancy and PTP time error of an IEC 61850 network.Interlocking table and CILO equationsInterlocking matrix per device, IEC 61850 EnaOpn and EnaCls equations, GOOSE signals between bays and FAT/SAT test cases per configuration.Per-unit base conversionBase current and impedance, conversion between %, pu and ohms, and change of base for transformers, generators and lines.Harmonic distortion THD and TDDVoltage THD and current TDD against the IEEE 519-2022 limits, with the spectrum as a bar chart.Symmetrical componentsPhase quantities to zero, positive and negative sequence and back (Fortescue), with phasor diagrams and what they mean for 46, 67Q and 51N.Vector group compensation (87T)TAP of each winding, phase compensation matrix, zero-sequence removal and the HV-to-LV clock diagram.Primary and secondary impedance (21)Primary to secondary ohms with the CT and VT ratios, line Z1, Z0 and k0, and zone reaches on the R-X plane.CT saturationRequired versus available voltage (5P/10P, PX or C class), time to saturation and the saturated waveform.DGA interpretationIEEE C57.104-2019 DGA status, Duval triangles 1, 4 and 5, IEC 60599 ratios and CO₂/CO of your transformer.Insulation temperature correctionInsulation resistance at 40 °C (IEEE 43) or 20 °C, PI, DAR and power factor of transformers and bushings, with the trend.Capacitor bankkvar to correct the power factor, steps of the automatic bank, capacitance and resonance with the transformer.Cable voltage dropΔV and % with R and X per km, copper or aluminium, mm² or AWG/kcmil, and the short-circuit check of the cable size.Battery sizingAh, number of cells and charger of a DC battery bank from its duty cycle, per IEEE 485 and IEEE 1115.Grounding resistanceGround rods, horizontal conductor and grid (BS 7430, IEEE 80), and soil resistivity from Wenner measurements.Technical glossarySubstation, protection and communications terms, explained in one or two sentences.
    WhatsApp