Protective relays and reclosers
Protective relays and recloser controls: settings, elements, curves, trip and reclosing logic, event reports and oscillography.
Home / Remote relay configuration
Our core serviceYour relays, configured remotely. Our team configures the protection, control and communications of your substation or plant remotely: new devices that arrive blank from the factory, or changes to equipment already in service, without waiting for an engineer to travel to site.
Everything programmable in the substation, not just the relays.
Protective relays and recloser controls: settings, elements, curves, trip and reclosing logic, event reports and oscillography.
Bay controllers, interlocking, local and remote commands, switching sequences and programmable logic.
IEC 61850 (GOOSE and MMS), IEC 60870-5-104 and -101, DNP3 (IEEE 1815), Modbus RTU and Modbus TCP, gateways, RTUs and switches, with point lists to SCADA.
Implementation of the project's P&C design in the devices: signals, alarms, metering and communications architecture.
We work with the brands most used in utilities and industry, such as SEL, Siemens, Hitachi Energy (ABB), GE, Schneider Electric, NOJA Power and Eaton, among many others. Tell us the brand and model of your device and we will confirm that we have the software and the experience to configure it.
A dedicated communications device at the substation, with an encrypted connection under your control.
You request the change or report the event, and access is opened only for that task.
We apply the change, check the result and send you the report with the configuration backup.
Protective relays, recloser controls, bay controllers, RTUs, gateways and switches from most commercial brands, as long as they communicate over Ethernet or over a serial port with a converter. Each manufacturer uses its own software, so before each job you tell us the brand and model and we confirm availability.
Yes. With the device connected to the substation network, we load the complete configuration from scratch, based on the project design and the approved settings.
Access is encrypted, never left open to the internet and enabled only with your authorization. Every session is logged.
No. Commissioning and secondary injection tests are done on site by your crew or your local contractor, and we can support them online. Our own field testing is available in Colombia, or elsewhere on request.
Our team works from Bogotá, Colombia (UTC−5), for clients worldwide, in English and Spanish. We agree each work window with you in your local time.
Tell us how many substations you have and which relays you use, and we will propose how to connect them.
Or email us:
[email protected]