Home / Tools / Function 55 power factor

Function 55: power factor

Lagging and leading power factor with definite time: pickup, reset, current supervision, inside the relay and a kit test plan.

IEEE C37.2§ 3.1.55function numbersSEL-751 PDS751§ Power Factor (55)ranges and accuracy

Example cases
Function 55: power factor

Only the basic data; the rest is taken with typical values.

ALearn

E1Settings

Operates when the load is inductive and the power factor drops below this value. Range 0.05 to 0.99 in the SEL-751.

s

1 to 240 s in 1 s steps in the SEL-751.

Operates when the load is capacitive and the power factor drops below this value.

s
% of In

Example setting of the model: with less current the power factor is not evaluated.

Example setting of the model: the stage resets when the power factor rises this far above the pickup.

E3Simulation
A
°

Positive: lagging current, inductive load. Negative: leading current, capacitive load.

E4Installation and test set
V
A

Example value: enter that of your test set. Points that exceed it are marked.

V

Example value: enter that of your test set.

E5Relay tolerances
%

Estimate: the SEL-751 data sheet does not state this value for the 55. Enter your relay's value.

cycles

Estimate: the SEL-751 data sheet does not state this value for the 55. Enter your relay's value.

ms

Use a decimal point. The calculation runs in your browser and updates as you type.

Function status

—

Operating time

—

Power factor

—

Test plan

—

From the primary to the relay and the trip coil
  • Rating
  • Active signal
Magenta lines are the primary; light lines are the protection and control wiring; dashed yellow lines are the communications. What lights up in yellow is what changes in the simulation.
Function characteristic with its tolerance
  • Characteristic
  • Tolerance band and point
The curve or the steps are the settings; the yellow band is the declared tolerance; the point is the simulation.
Test set connected to the relay
Select a point in the “Test plan” tab: the drawing shows what the test set injects at each terminal. Before connecting, short-circuit the CTs and open the VTs and the trip circuit at the test block.

Test plan with injection test set Pro

#TestInjectionExpectedMinimumMaximumMeasuredResult

What each parameter is

ParameterValueWhat it does

Loading these settings into a relay? We configure it remotely.

What it is for

The 55 monitors the power factor of a feeder or a load. It operates when the factor drops below a value with an inductive load, for example lightly loaded motors, or with a capacitive load, for example a capacitor bank left connected for too long.

It is used to disconnect compensation banks, raise an alarm for power factor penalties or separate a synchronous motor that lost synchronism.

How it operates

  • The relay calculates the three-phase power factor from the voltages and currents: it is the cosine of the angle between them. It tells whether the current is lagging or leading.
  • Each stage monitors one side: the lagging stage only operates with an inductive load and the leading stage only with a capacitive load.
  • With very little current the angle is not reliable; that is why the function is supervised with a minimum current.

The relay drawing is the same in all Tiza protection functions: a generic numerical relay, not a specific brand. Its terminals, blocks and inputs light up according to the function.

Test plan

The injection kit applies rated voltages and currents of at least the rated value, where the accuracy is stated, and rotates their angle: the power factor is the cosine of that angle.

The plan finds the pickup and reset of each stage, measures its delay, and checks that it does not operate at PF 1 and that it stays blocked with low current.

Before connecting the test set: short-circuit the CT secondaries at the test block, open the VT secondaries on the yard side, and open the trip links to the breaker and to other relays. The results sheet is printed or downloaded as CSV with the measured values and the result of each point.

Limits of the calculation

  • Balanced voltages and currents are simulated; with unbalance the three-phase factor depends on each relay's method.
  • The current supervision and the reset difference are example settings.
  • The cited data sheet does not state the delay accuracy of the 55: the time tolerance is an estimate.

Frequently asked questions

What angle corresponds to a PF of 0.85?

The arc cosine of 0.85: about 31.8°. If the current lags the voltage by more than that, the lagging stage picks up.

Why are there two stages?

Because the same power factor can be inductive or capacitive. A PF of 0.8 with leading current indicates overcompensation, not undercompensation.

What current is used for testing?

At least half of the rated current, which is where the cited manufacturer states the accuracy. The plan uses the relay's rated current.