Current transformer (CT) tests
Pick the core and the test: the drawing shows the CT with the test-set connection, what is energized and what is measured. Type your readings and the tool calculates the result, applies the corrections and compares it with the criterion and its source.
IS 2705-1:1992§ 3.13, 3.14, C-2.4, D-1error, phase displacement and polarityIS 2705-2:1992§ 3.3, tablas 1A-1C, 7.1.2measuring classesIS 2705-3:1992§ tabla 1, 7.1.2.2protection classesIS 2705-4:1992§ 2.1, 3.1.2, 4, 6knee point and class PSUSBR FIST 3-8 (2011)§ 5.3, 5.5, 6, 7, ap. D y Efield tests
Results
—
—
—
—
Charts
- Source
- Measured
- Error
- Source
- Measured
- Error
- Source
- Measured
- Error
- Source
- Measured
- Error
- Source
- Measured
- Error
- Source
- Measured
- Error
- Measured
- Original
- Required
How it was calculated and standards
Step-by-step calculation
Test plan and results sheet
| Test | Expected | Measured | Status | Trend | Source |
|---|
What it is for
A current transformer that measures wrong makes the protection trip when it should not, or not trip. These tests check that the CT has its rated ratio and polarity, that its core does not saturate too early, that the connected burden fits its class and that the insulation is sound.
Each test has its own sheet. The drawing shows the outdoor CT with its primary P1-P2, its cores, the terminal box and the test-set connection. If a lead goes to the wrong terminal, the tool marks it as a failure and explains why.
How it is calculated
IS 2705-1:1992§ 3.13current error
Ratio error
ε = (Kn·Is − Ip) · 100 / Ip · voltage method: N ≈ Vs/VpKn is the rated ratio. With the current method it is compared with the class table at the test point; the voltage method gives the turns ratio.
IS 2705-4:1992§ 2.1IEC knee
IEC and IEEE knee points
I(1.1·Vk) = 1.5·I(Vk) · IEEE: d(log V)/d(log I) = 1The measured curve is interpolated on log-log axes. The IEEE knee is where the slope passes through 45° (NPAG, §6.4.13; FIST 3-8, appendix E).
IS 2705-3:1992§ 7.1.2.2indirect composite error
Composite error from the excitation curve
E = ALF·In·|Rct,75 + Zb| · εc ≈ Ie(E)·100 / (ALF·In)Valid for low-reactance CTs with a toroidal core and an evenly spread winding. A measuring core uses the instrument security factor: the current must reach 10 % (IS 2705-2, 7.1.2).
IS 2705-1:1992§ D-1.1.2copper resistance
Resistance at 75 °C and burden
R75 = RT·(234.5 + 75)/(234.5 + T) · S = (V/I + Rlead)·In2The burden is measured by injecting current into the burden side with the CT disconnected (FIST 3-8, appendix D).
Limits of the calculation
- The class limits are those of IS 2705 (1992). For a new CT, confirm them with IEC 61869-2 or with the manufacturer.
- The primary insulation and the resistance tolerance against the factory value have no published limit in the sources used: you type them.
- Insulation resistance is not corrected for temperature and the polarization index is not calculated.
- The drawing is a typical three-core CT. If yours is arranged differently, use the equivalent terminals.
- The composite error by the indirect method is only valid for low-leakage-reactance CTs.
Frequently asked questions
Which field tests are made on a current transformer?
Ratio and polarity, the excitation curve and its knee point, secondary winding resistance, insulation, connected burden and demagnetization. FIST 3-8 asks for the ratio at commissioning and for the excitation at commissioning and at least every 6 years.
What is the difference between the IEC and the IEEE knee point?
The IEC knee is the voltage from which 10 % more voltage needs 50 % more exciting current. The IEEE knee is the point where a 45° line is tangent to the curve drawn on log-log axes. The IEEE knee sits lower on the curve.
Why does the CT have to be demagnetized?
A DC test, such as the resistance test or the battery polarity check, leaves remanent flux in the core. That flux distorts the excitation and the ratio, and in service it can saturate the CT early. The core is demagnetized with AC voltage that first saturates it and then falls continuously to zero.
What happens if a CT secondary is opened with current in the primary?
The CT tries to keep the current flowing and the secondary voltage rises to very high values. It can break down the insulation, damage the CT and injure anyone nearby. That is why the secondaries not being measured are left shorted and earthed.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerInductive load switchingSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws