Inductive load switching
Enter the load, circuit-breaker and insulation data: the tool calculates the chopped current, the suppression overvoltage, the load oscillation and the re-ignitions, and tells you whether surge arresters, controlled switching or an RC damper are needed.
IEC TR 62271-306§ 16.2shunt reactorsIEC TR 62271-306§ 16.3HV motorsIEC 62271-110§ 3.103definitionsIEC 60071-2§ 4.3.4safety factorIEC 60071-2§ 5.2.1conversion to lightning impulse
Results
— A
— p.u.
— kHz
— p.u.
— kV
—
Charts
- Energised
- Load oscillation
- Measured
- Load
- Source
- Withstand / Ks
- Suppression peak
How it was calculated and standards
Step-by-step calculation
What it is for
It estimates the overvoltages that appear when opening a shunt reactor or an HV motor: the current the breaker chops before zero, the suppression peak at the load, the transient voltage across the contacts and the peak of a re-ignition. It compares them with the load insulation and proposes the right limitation.
How it is calculated
IEC TR 62271-306§ 16.2.2equation 100
Chopped current
ich = λ·√(N·Ct) · Ct = CP + CS·CL/(CS + CL)IEC TR 62271-306§ 16.2.2equations 96 and 97
Suppression peak
ka = −κ + √((kin + κ)² + (1 + κ)·L·ich²/(CL·U0²)) · κ = LN/(L + 2LN)It is the energy balance: the magnetic energy ½·L'·ich², with L' = L(1 + κ), goes into the load capacitance.
IEC TR 62271-306§ 16.2.2 a 16.2.4equations 107 to 110 and 16.2.6.3 a)
Recovery and re-ignition
krv = 1 + 2κ + ka · kp = 1 + β·krv · fL = 1/(2π√(L(1 + κ)·CL)) · β = 0.5Limits of the calculation
- One pole with lumped capacitances: if the connection is long or there are several frequencies, an EMTP study is needed.
- The chopping number does not apply to vacuum circuit-breakers or contactors: the chopped current you enter is used.
- It does not model voltage escalation by multiple re-ignitions or virtual current chopping.
- The re-ignition is compared with the lightning impulse; its steep front is unevenly distributed over the first turns.
Frequently asked questions
Why does a small current produce a large overvoltage?
Because the breaker chops it before its natural zero. The magnetic energy left in the inductance goes into the load capacitance, and with little capacitance the voltage rises a lot. That is why reactors are a difficult case. For motors, the most severe case is interrupting the starting current: more current is chopped and there are more re-ignitions.
Does the chopping number apply to a vacuum circuit-breaker?
No. In vacuum the chopped current depends mainly on the contact material, not on the circuit. The tool then asks for the chopped current declared by the manufacturer or measured.
Does a surge arrester eliminate re-ignitions?
No. It limits the voltage to earth at the load, but re-ignitions still occur. Against re-ignitions, controlled switching is used on reactors and RC dampers on motors with vacuum circuit-breakers.
We review the switching of your reactor or motor
We calculate the switching overvoltages and choose the limitation with the data of your installation.
Related guides
Other tools
All tools
Solar energy
PV system sizingPV production and energy costPV I-V curveAGPE classifier and connection proceduresCable voltage dropSolar plants and the grid codeP-Q capability testPPC control testsPlant model validationCND supervision indicatorsPMU tests and commissioningRenewable energy tax incentives (Colombia)
Protection
Function 50/51 overcurrentFunction 27/59 voltageFunction 81 frequencyFunction 67/67N directionalFunction 46 negative sequenceFunction 49 thermal overloadFunction 25 synchronism checkFunction 32 reverse powerFunction 51V voltage overcurrentFunction 64G stator groundFunction 27TN third harmonicFunction 64F rotor groundFunction 78 out-of-stepFunction 50/27 inadvertent energizationFunction 37 undercurrentFunction 38 bearingsFunction 48 incomplete sequenceFunction 66 starts per hourFunction 51LR locked rotorFunction 14 underspeedFunction 47 phase sequenceFunction 59N residual overvoltageFunction 60 fuse failureFunction 55 power factorFunction 46BC broken conductorFunction 68 power swing blockingFunction 87N restricted earth faultFunction 63 Buchholz and pressureFunction 26 oil temperatureFunction 71 oil levelFunction 87B bus differentialFunction 60C bank unbalanceFunction 51G neutral groundFunction 79 reclosingFunction 86 lockoutFunction 94 tripFunction 74 trip supervisionFunction 87L line differentialPhasor diagramRelay coordinationCurrent transformer: burden and saturationVector group compensation (87T)Frequency df/dt rampBreaker failure 50BF87 differential settingCT and VT selectorDistance setting 21MV feeder coordinationMotor protectionBoundary meteringGenerator protectionLoad shedding 81 and UVLSShunt reactorSynchronizing and closing 25/78Secondary arc and single-pole reclosing
Analysis and communications
COMTRADE records: viewer and generatorOscillography analysisIEC 61850 SCL viewerIEC 61850 SCL auditorIEC 61850 network: GOOSE/SV addresses and process busIEC 60870-5-104 APDU decoderIEC 61850 to IEC 60870-5-104 and 101 mappingICCP bilateral table checkerIP and VLAN planDNP3 and Modbus decoderTeleprotection channel timeOptical and radio link budgetTime synchronisationMMS control sequenceGOOSE simulatorIEC 61850 station networkInterlocking table and CILO equationsCause-and-effect matrix and logic checkerZones and conduits (IEC 62443-3-2)Zone firewall rule reviewerRoles and permissions (IEC 62351-8)IED X.509 certificate verifierDevice hardening baselineIncident response exercise (CNO 2188)Cybersecurity gap: CNO and IEC 62443
Equipment testing and diagnostics
Commissioning checklistCurrent transformer testsDisconnector and GIS switchgear testsGrounding system testsPower cable testsVoltage transformer testsInsulation diagnosis: dissolved gases (DGA) and temperature correctionTransformer TTR testTransformer winding resistanceTransformer insulation, PI and DARTransformer power factor and capacitanceTransformer excitation currentTransformer SFRATransformer leakage reactanceTap changer dynamic resistanceCalibration and uncertaintyPCB equipment: classification and deadlinesRETIE pre-inspectionTransformer test interpreterCircuit breaker testsTest budgetMaintenance plan and health indexSF6 inventory and leakage
Electrical studies
Lightning protectionShort circuit and per-unit systemGround fault and neutralShort-circuit checkerPower transformerTransformer noiseSafety clearancesArc flashGrounding resistancePower-frequency electric and magnetic fieldsCurrent split factor SfApproach boundariesSubstation configuration selectorBusbar stressesInsulation co-ordinationTRV and short-line faultGenerator circuit-breakerSwitch-fuse combinationDisconnector and earthing switchMV switchgear and GIS specifierMV cable insulation levelInsulator strings: mechanical checkSeismic qualification of substation equipmentSurge protective device selectionElectric vehicle charging station
Yard equipment control
Circuit breaker controlDisconnector controlTransformer controlMV switchgear controlCapacitor bank controlAuxiliary services controlIEC 61850 bay controllerRecloser control
Industry and power quality
Motor startingHarmonic distortion THD and TDDEquipment harmonic emissionHarmonic emission allocationCapacitor bankBattery sizingRegulatory quality indicatorsCapacitor bank protectionSubstation DC systemsPower qualityGenerating sets to ISO 8528Lighting design to RETILAPControl valve Cv and Kv and affinity laws